Forum quick links
Cold Climate
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Erin Holdenried on
Does anybody have experience using an alternate compliance path for a project in a cold climate?
No Smoking Signage for a University Dormitory
EBOM-v4 EQp2:Environmental Tobacco Smoke Controlposted by Patricia Andrasik on
Currently we have no smoking signs on the residence hall's main entrances, the ones used by residents to get in and out of the building.
FTE and LEED boundary - LEED CI (v4)
posted by Anna de Anguera on
For LEED CI - this may be so obvious and that is why it is not actually stated anywhere - but I'm assuming that FTE's are calculated based on your LEED boundary, and excludes the rest of the buildi
LEED Boundary on large site multiple buildings - 1 certifiable
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Alexander Clark on
I have a project that is on a 50 acre site that will be all developed. The project will have (7) structures on the site.
FTE - Healthcare buildings
Healthcare-v2009 PIf3:Occupant and Usage Dataposted by VICTOR MORENO on
In our Healthcare project, there are workers during the morning, afternoon and evening, with a time of 8 hours each. if I count the FTE, I get a total of workers greater to the number of workstati
washer/dryer - what is actual issue, the exhaust or chemicals?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Renee Shirey on
We have a project that has a washer & dryer in the corner of a building services room, for periodic/sporadic use.
Auditorium - Core Learning or Ancilliary Learning space?
posted by Maya Karkour on
Hello, We have a new building on a K12 school campus. The building includes 1 big auditorium (300 seats) and a gymnasium.
SSc5.1 or SSc5.2
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Sheryl Swartzle on
My project is a Hotel in urban area with almost a zero lot line. The owner purchased fifteen 25 ft.
FSC - outside building envelope
NC-2009 MRc7:Certified Woodposted by Bomin Kim on
We're shooting for 95% FSC wood in our project and were wondering if permanently installed wood items outside the envelope are included in this number. Thank you
Separating waste - reuse at household
CI-2009 MRc2:Construction Waste Managementposted by Maria Glädt on
We have a project where there for example lighting fittings, some doors etc. that would be possible to reuse at other in other buildings.