Forum quick links
Mandate bicycle or pedestrian usage to reduce the extraction of natural resource
posted by THAMARAI SELVI.M on
When we encourage to use electric vehicle we also need to consider that most battery are also naturally sourced material like lithium.
LEED v5 BD+C/ID+C: Indoor Environmental Quality public comments
posted by Nadav Malin on
Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C: Indoor Environmental Quality section on this forum.
EAp: Fundamental Commissioning
posted by Christopher DeJulis on
ASHRAE Standard 90.1 4.2.5.1 requires that the building envelope undergoes
functional performance testing (FPT) and states that testing must use generally
LEED v5 BD+C/ID+C Materials and Resources public comments
posted by Nadav Malin on
Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C Materials and Resources category on this forum.
IDC Assess and Reduce Embodied Carbon
posted by Nadav Malin on
The ID+C credit Assess and Reduce Embodied Carbon, Option 2: It's unclear what are the referenced Paths 1, 2 and 3 for this credit.
LEED v5 BD+C/ID+C Sustainable Sites public comments
posted by Nadav Malin on
Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C Sustainable Sites category on this forum.
LEED O&M Starter Kit and Pilot Credit Safety First: Cleaning and Disinfecting Your Space
NC-v4 INc1:Innovationposted by James Keohane on
Is it acceptable to for a LEED v4 BD+C: NC project to seek BOTH innovation point for LEED O&M Starter Kit and a Pilot Credit INPC 137- Safety First: Cleaning and Disinfecting Y
MR Credit: Waste Performance
posted by Anna Dengler on
A couple suggestions: There should be an option to qualify for 9 points (or the full number of points, if not 9) by completing TRUE Certification (at any level) since the certification requires 90%
LEED v5 BD+C/ID+C Location and Transportation public comments
posted by Nadav Malin on
Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C Location and Transportation category on this forum.
First public comment draft of LEED v5 BD+C/ID+C: Integrative Process
posted by Nadav Malin on
Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments section on this forum.