Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

ACP forms and documentation guidance

General forums
posted by  Jens Apel  on 

Could anyone please guide me to the current ACP forms and the documentation guidance?

3
Fri Aug 3, 2012, 1:44 pm

DX unit EER and Fan Power

NC-2009 EAc1:Optimize Energy Performance
posted by  Steven Er  on 

Hi, I understand EER of DX unit from ASHRAE 90.1 include indoor fan power. Compressor and condenser fan power shall be derived from EER that subtracting indoor fan power.

3
Fri Aug 3, 2012, 9:29 am

+50% Alteration?

EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additions
posted by  Michelle Bracewell-Musson  on 

I have come across this on more than one occasion and different projects (CI and EBOM).

5
Thu Aug 2, 2012, 7:40 pm

Waste audit

CI-2009 MRp1:Storage and Collection of Recyclables
posted by  Harsha Sharma  on 

I am working on an Environmental Retail Store which comprises of environment friendly products, appliances, organic food items, clothing along with a Cafe and 4 office spaces.

2
Thu Aug 2, 2012, 5:22 pm

Changes to system after project has been certified, what to do?

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Courtney Royal  on 

What is your experience with LEED projects that remove a specific technology (project did earn a LEED point) due to another recommendation, say a third party energy audit after the project was alre

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Thu Aug 2, 2012, 4:57 pm

Project in Europe and Energy Star

CI-2009 EAp2:Minimum Energy Performance
posted by  Maria Porter  on 

I’m starting to realize that it will be hard to find Energy Star rated equipment in Sweden. Computers – no problem, but for fridges, dishwashers etc we use the European EU energy rating system.

5
Thu Aug 2, 2012, 12:48 pm

42" line of sight

posted by  Rebecca Molldrem  on 
12
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Wed Aug 1, 2012, 8:05 pm

Design air flow rate

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

I don’t understand the meaning of paragraph G3.1.2.8 of ASHRAE 90.1, in particular: “System design supply airflow rates for the baseline buildings design shall be based on a supply-air-to-room-air

2
Default Avatar
P.E.
Midwest Engineering Professionals
LEEDuser Basic Member
2 thumbs up
Wed Aug 1, 2012, 2:00 pm

NAUF and FSC

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Kris Phillips  on 

Based on review comments from previous projects, I am under the impression that if you list an item in IEQc4.4, you must also list that same item in MRc7 - although this is not explicit in the v200

4
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Wed Aug 1, 2012, 1:28 pm

Double Parking

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Beatriz Aruth Sturm  on 

Our parking lot is composed by double parking spaces because of the reduced area.

3
Tue Jul 31, 2012, 8:47 pm