Annual Energy Cost Escalation
Schools-2009 EAc2:On-Site Renewable Energyposted by Michael Trzcinski on
If a project includes a 3rd party PV system, and the electric rate increases each year after the 1st year (under the PPA), what rate must we use in calculating the dollar savings?
Multiple buildings simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Hello, We are working on a project that has been registered as one single project (NC 2009), but it actually corresponds to three buildings, one is a laboratory, another a distribution storage and
Polished Concrete
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Brynn Horley on
I have had contractors submit an argument that acetone is exempt from IEQ considerations. Is that true?
LEED CI project in China
CI-2009 EAp2:Minimum Energy Performanceposted by Diana Hill on
Hello, We are doing a LEED CI project in China. This is a office building with two 16-floors buildings A, B and a 9-floors building C, which are connected by a 7-floors podium.
IEQp1 multiple zone system
NC-2009 IEQp1:Minimum IAQ Performanceposted by Todor Boyadzhiev on
Hello, I am working on a School project and I am currently filling in the information in 62MZ calculator for multiple zones. I have a question.
Daylighting Query
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Jane Long on
The upload credit asks you confirm calulations were carried out for both 0900 & 1500 on the 21st september, but the Supplemental daylight & Views Calc spreadsheet has only entry for one set
FTE for WEp1 in multiple building projetc
posted by Marcio Alberto Casado Pereira on
We have a 4 building project, it's an industrial plant. Showers and changing rooms will be concentrated in one building that wil serve the entire plant for that matter.
Green Education
EBOM-2009 IOc1:Innovation in Operationsposted by SIG - Sustainability Main Account on
I'd like to ask if anyone can share success stories of how they successfully educated tenants about 'What is LEED.' I am finding that in existing buildings, even though we held lunch and learns wi
How to conduct a flush out during a phased construction project
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Cheryl Burkinshaw on
We are working on a renovation project where construction is being conducted in phases.
ACP forms and documentation guidance
posted by Jens Apel on
Could anyone please guide me to the current ACP forms and the documentation guidance?