Forum quick links
Strategy 1. Entryway Systems
CS-v4.1 EQc1:Enhanced Indoor Air Quality Strategiesposted by Alto ingénierie on
Hello for Strategy 1. Entryway Systems linked to Enhanced Indoor Air Quality ,
Calculation Rainwater Amount V4 vs V2009
NC-v4 SSc4:Rainwater managementposted by Anna Korinkova on
Hello everyone,
Distribution center, unconditioned space
NC-v4 EAp2:Minimum energy performanceposted by santiago sanchez on
Good afternoon all,
Non-predominant condition on multifamily building
NC-v4 EAp2:Minimum energy performanceposted by Nicolas Martinez Ochoa on
Hello everyone,
Material Ingredient Reporting
CS-v4.1 MRc4:Material Ingredientsposted by Elinor Sullivan on
When I input the different material ingredient reporting certificates ie: Declare labels, HPD etc...
HOW MANY METERS
Hospitality-CI-v4.1 EAc3:Advanced Energy Meteringposted by JORDI CASTELLANO on
We are conducting a certificate LEED for a student residence.
We have a doubt regarding the meters that must be placed. We don't know if we:
Trend of water meter and leak sensor in Japan projects
Pilot-Credits WEpc153:Water Leak Detection and Monitoringposted by Yohei Ohashi on
I am seeking to achieve Pilot-Credits WEpc153 - Water Leak Detection and Monitoring for LEED ID+C. The Project in Japan generally is required to install a tenant level water meter and
Parking Lots at undergraound at the basement
NC-v4 LTc7:Reduced parking footprintposted by Stephan Zweig on
Hello,
I have following question:
If in a project there are parking lots in the building at the basement, can this project be eligible for the credit “reduced parking”?
Residential Exterior Trim
posted by Amy Latva-Kokko on
Hello All,
A group of us (three architects and a builder- sounds like there should be a joke here) were debating this and we are stumped.