We have a LEED Campus project where all the indv buildings on the campus are BD+C:Core&Shell. However, the master site in LEED Online is appears to be in the format of New Construction.
The issue is that NC and CS have different poitn allocations for some credits. For example, we'd lilke to document High Priority Site at the master site level. However, under NC, the pirpority designation pathways only awards 1pt for that credit - so that is what is shown in LEED Online under the master site. But under CS, priority designation pathway awards 2pts for the credit.
If we document the High Priority Site under the master site, will the individual CS buildings still be awarded their 2pts?
Andrey Kuznetsov
ESG consultant, LEED AP BD+CSelf Employed
34 thumbs up
May 11, 2024 - 11:48 am
I don't have much experience in campus projects. As per my knowledge and per "LEED Campus Guidance" there is no limitations for C&S projects.
If there no option at LEED Online to switch to overall C&S, it better to submit such documentation individually to each project, to gian more points.
I think it's similar to v4/v4.1 - you can start group project as v4, but switch for v4.1 credits https://leeduser.buildinggreen.com/forum/leed-group-projects-can-swap-v4...