Topic

RE: LI#10397

NC-2009 EAc2: On-Site Renewable Energy
posted by Joe Manganelli on Aug 16, 2016, 6:36 pm

Hi All,

Does anyone have any experience with LI#10397?

This LI# stipulates an alternative compliance path for facilities that have 60% or more non-regulated loads.

QUESTION 1...

Last reply: Joe Manganelli, Aug 17, 2016, 4:31 pm

RE: Feeding renewable energy into the project

NC-2009 EAc2: On-Site Renewable Energy
posted by Joe Manganelli on Aug 16, 2016, 6:41 pm

Hi All,

We have a campus with a substation on-site (on owner's property) that will be owned by the local utility. The Owner would like to tie in the power generated by an on-site solar...

Last reply: Marcus Sheffer, Aug 17, 2016, 11:35 am

PV Energy sent to Local Grid- Eligibility for EA c1 & EA c2

NC-2009 EAc2: On-Site Renewable Energy
posted by varun potbhare on Aug 7, 2016, 2:44 am

I am working on Museum Project in Doha. Owner of the Museum intends to install 3000 panels on the car park. The clients wants to enter a MoU with local electricity service provider wherein all...

Last reply: varun potbhare, Aug 15, 2016, 1:38 am

Form

NC-2009 EAc2: On-Site Renewable Energy
posted by GISELA FARHAT DE ARAUJO on Jul 12, 2016, 2:10 pm

The EAC2 Form asks for "Annual Renewable Energy Cost". You said in a post that is "It is the avoided energy cost associated with the renewables at the virtual rate from the Proposed model. So it...

Last reply: Marcus Sheffer, Jul 13, 2016, 10:41 am

Eac2 form

NC-2009 EAc2: On-Site Renewable Energy
posted by GISELA FARHAT DE ARAUJO on Jul 12, 2016, 1:57 pm

Hi.
I have a 34,2 Kw solar system that generate 49.425...

Last reply: GISELA FARHAT DE ARAUJO, Jul 13, 2016, 6:56 am

Shared solar array on a campus with separate utility feeds

NC-2009 EAc2: On-Site Renewable Energy
posted by Rebecca Bryant on Jun 30, 2016, 10:43 am

We are working on a hospitality project that is attempting LEED Gold, and is part of a larger campus. Installing the PV array on our roof is not ideal from a resiliency perspective, since we are...

Last reply: Rebecca Bryant, Jul 12, 2016, 2:42 pm

LEED EAc2 for Campus

NC-2009 EAc2: On-Site Renewable Energy
posted by Mauricio Ramirez on Mar 15, 2016, 12:51 pm

Hello. I'm working on a Campus project that are designing a large PV installation in the roof and façade of the different building as they are built, but that will cover also areas outside of the...

Last reply: Mauricio Ramirez, Jul 1, 2016, 3:44 pm

Solar energy used with previous LEED project credit

NC-2009 EAc2: On-Site Renewable Energy
posted by Zane Lichtneger on Jun 23, 2016, 3:56 pm

We have a solar farm on our site that generates about 1.7 million...

Last reply: Marcus Sheffer, Jun 24, 2016, 12:11 pm

Jute Boiler

NC-2009 EAc2: On-Site Renewable Energy
posted by SAMY Chamy on Jun 24, 2016, 7:49 am

Dear All:-

In our project we have Jute boiler in our project with 2.0 Ton capacity

This boiler utilizes the Jute scrap but the scrap is collect fro nearest jute making stations...

Last reply: Marcus Sheffer, Jun 24, 2016, 10:45 am

Solar Water Heating System

NC-2009 EAc2: On-Site Renewable Energy
posted by Kalyan Nishtala on Jan 6, 2016, 11:43 am

Hi,
Has anyone found a reliable calculator for estimating savings from a solar water heating system that has been submitted and accepted by USGBC reviewers. I am looking for something...

Last reply: Marcus Sheffer, Jun 17, 2016, 9:06 am