EWH ASHRAE ComplianceNC-2009 EAc1: Optimize Energy Performanceposted by Osama Touni on Mar 24, 2019, 6:09 am
Hi Regarding Electric water Heater, is there any equation to calculate the EWH energy factor to compare the result with the equation of ASHRAE 90.1-2007...EFmin = 0.97* − (0.00132 × V... Last reply: Marcus Sheffer, Mar 26, 2019, 9:56 am |
|
Slab-on-grade Vs Slab-below-gradeNC-2009 EAc1: Optimize Energy Performanceposted by Anna Korinkova on May 17, 2018, 8:11 am
We have an office building project with garages going 4 storeys underground. The building foundation slab is about 16m deep. Should this slab still be considered for 'slab-on-grade' (even if it... Last reply: Marcus Sheffer, Oct 9, 2018, 3:51 pm |
|
How to use Title 24 2016 to comply with LEED 2009 EAc1NC-2009 EAc1: Optimize Energy Performanceposted by Bo Yi on Sep 11, 2018, 2:09 pm
Hi, I am doing a LEED 2009 project. The project is in California and complied with Title 24 2016. I am trying to use title 24 to comply the LEED EAc 1. I have two questions. 1. LEED... Last reply: Marcus Sheffer, Sep 11, 2018, 2:58 pm |
|
Adiabatic HumidificationNC-2009 EAc1: Optimize Energy Performanceposted by Mike oliva on Aug 9, 2018, 6:19 pm
I'm trying to wrap my head around modeling an adiabatic humidification system for our project that I can't directly model within TRACE that I know of. I'm planning to model the humidification... Last reply: Marcus Sheffer, Aug 10, 2018, 12:08 pm |
|
Renewables off-siteNC-2009 EAc1: Optimize Energy Performanceposted by Ricardo Sá on Apr 5, 2018, 1:27 pm
Hi, we are working in a project pursuing LEED certification (NC v2009). The owner wants to achieve the Platinum Level and that implies an area of PVs larger than the area available... Last reply: Marcus Sheffer, Aug 3, 2018, 1:35 pm |
|
LEED Energy Modeling- Credits EAp2 and EAc1NC-2009 EAc1: Optimize Energy Performanceposted by Andrew Buck on Jul 6, 2018, 9:39 am
We are working on a Hotel project in Chicago, Illinois (USA) with LEED NC v2009. Is my understanding correct in that for credit EAp2 you can follow LEED v.4, and for EAc1 you can follow LEED v.... Last reply: Marcus Sheffer, Jul 6, 2018, 11:32 am |
|
Baseline Exterior Lighting Power AllowanceNC-2009 EAc1: Optimize Energy Performanceposted by Cory Duggin on Feb 27, 2015, 2:52 pm
USGBC Addenda 100001062 updated the exterior lighting table for LEED v3 projects to the 90.1-2010 allowances. The addenda just says it updates credit SSc8 though. Should the new allowances be... Last reply: Marcus Sheffer, Jun 14, 2018, 3:01 pm |
|
Thermal energy storage for district coolingNC-2009 EAc1: Optimize Energy Performanceposted by Nuttanee Vongveeranonchai on Apr 27, 2018, 8:15 am
I am modelling a project receiving chilled water from the district cooling plant with an ice storage and wondering how to account for energy use shifting in the building model if I use Option 2... Last reply: Tyler Thumma, May 4, 2018, 10:34 am |
|
Service water heating for process water usageNC-2009 EAc1: Optimize Energy Performanceposted by Kris Phillips on Apr 26, 2018, 12:42 pm
I have a commercial kitchen facility that has a number of plumbing fixtures used for pot filling, etc, which are considered process water (and is reflected as such in the Water Use Reduction... Last reply: Marcus Sheffer, Apr 26, 2018, 4:09 pm |
|
Baseline Economizser Requirement for Data Center RoomsNC-2009 EAc1: Optimize Energy Performanceposted by Hirak Patel on Sep 12, 2012, 12:38 pm
Hi, I am modeling Airport Traffic Control Tower project for LEED 2009 and I have question regarding economizer requirement. We have data center rooms which are served by CRAC units. We... Last reply: Torsten Biernat, Apr 12, 2018, 2:56 am |