Forum » NC-2009 EAp2
Topic

only DOAS ventilation space

NC-2009 EAp2: Minimum Energy Performance
posted by Jae Yong Park on Jul 22, 2013, 9:17 pm

the project primary HVAC system is VRF+DOAS.
there is one work shop space that have no indoor VRF unit but outdoor air intake through DOAS.
DOAS is not intended for conditioning space...

Last reply: Marcus Sheffer, Jul 23, 2013, 9:56 am

Coast Guard Materials Building

NC-2009 EAp2: Minimum Energy Performance
posted by Jeff Pilarca on Jul 22, 2013, 6:09 pm

We are starting 8000 sqft Coast Guard Materials Building that has 1300 sqft air conditioned office area. Rest of the building is exhausted. How would you energy model this building?

Last reply: Joseph Snider, Jul 23, 2013, 9:12 am

Automatic shades with manual control

NC-2009 EAp2: Minimum Energy Performance
posted by Erika Duran on Jul 19, 2013, 1:58 pm

ASHRAE 90.1-2007 mentions that for the Proposed case automatically controlled fenestration devices or shades may be modeled, but manually controlled shades should not be modeled. I have a...

Last reply: Marcus Sheffer, Jul 22, 2013, 10:16 am

Same certification process with separated HVAC systems

NC-2009 EAp2: Minimum Energy Performance
posted by Luana Bertoletti on Jul 19, 2013, 8:05 am

Hi,

I have a doubt on how to model the baseline HVAC system of a specific project, which consists of a 4-floor...

Last reply: Marcus Sheffer, Jul 22, 2013, 10:03 am

Building Addition / DES / existing pumps in original part

NC-2009 EAp2: Minimum Energy Performance
posted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Jul 17, 2013, 11:22 am

I am not too sure how to interpret this situation: This project is an addition (Phase II) to an existing 5 year old building (Phase I). Phase I is LEED certified. It is on a campus with a...

Last reply: Marcus Sheffer, Jul 17, 2013, 11:54 am

Proposed ERV vs. Baseline VAV

NC-2009 EAp2: Minimum Energy Performance
posted by Laura Long on Jul 11, 2013, 2:34 pm

I have a question regarding G3.1.2.8. Per this section a return fan is required for the baseline system if there is a return fan in the proposed model. Does the exhaust fan of the proposed...

Last reply: Marcus Sheffer, Jul 17, 2013, 11:04 am

Thermal Blocks-HVAC Zones designed

NC-2009 EAp2: Minimum Energy Performance
posted by Elena Grau on Jul 17, 2013, 6:09 am

Hello,
I'm working in the simulation of a building which has many HVAC zones defined so that should be modeled each ones as a separated thermical block but the zones of proposed building...

Last reply: Marcus Sheffer, Jul 17, 2013, 9:03 am

Fan power BaseLine

NC-2009 EAp2: Minimum Energy Performance
posted by VICTOR MORENO on Jul 16, 2013, 7:16 am

Hello everybody,

I´m simulating a LEED Project.

When calculating the powers of the fans as G3.1.2.9, the result is adequate. Fans are constant flow, and the system is PSZ-HP (...

Last reply: Marcus Sheffer, Jul 17, 2013, 8:55 am

Compliance with Table 7.8- Service hot water

NC-2009 EAp2: Minimum Energy Performance
posted by Ward Miller on Jul 16, 2013, 9:21 am

As far as we read the Mandatory Requirements of ASHRAE 90.1 required by EAp2, performance requirements must meet the specifications of Table 7.8. As electric resistance boilers have essentially...

Last reply: Marcus Sheffer, Jul 16, 2013, 10:54 am

regularly occupied sf

NC-2009 EAp2: Minimum Energy Performance
posted by Jean Marais on Jul 11, 2013, 8:54 am

1) Why is column regularly occupied sf in leedonline EAp2-1 table needed?
2) We have filled out EAp2-1 as per the spaces used in the energy model, not the project per say...i.e. thermal...

Last reply: Christopher Schaffner, Jul 15, 2013, 3:18 pm