Building Envelop Requirement on Manufacturing facilityNC-2009 EAp2: Minimum Energy Performanceposted by Xun Jia on May 10, 2012, 1:48 pm
I am working on a winery facility which includes office spaces and manufacturing spaces. Does LEED NC require the building envelop parameters (e.g. U-values, SC) of manufacturing parts of the... Last reply: Marcus Sheffer, May 16, 2012, 1:19 pm |
|
Naturally Ventilated Garment Factory for 90.1 appendix GNC-2009 EAp2: Minimum Energy Performanceposted by Kevin Sullivan on May 9, 2012, 1:11 am
We are looking to certify a garment factory in Dhaka which will not have any conventional HVAC systems. We would like to know if the following approach can be used for attempting LEED Optimize... Last reply: Kevin Sullivan, May 14, 2012, 1:42 pm |
|
Using AEDGNC-2009 EAp2: Minimum Energy Performanceposted by David Tratt on May 10, 2012, 4:49 pm
There are two AEDG's for small office buildings. Which should be used for a 12,000 sf building to achieve the 10-14% improvement over 2007? The 30% or the 50%? Last reply: Marcus Sheffer, May 10, 2012, 5:04 pm |
|
Floor not yet occupied for simulationNC-2009 EAp2: Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on May 10, 2012, 10:39 am
I have a 3 storey office building pursuing LEED NC. 2 of the 3 pavements are going to be occupied right after the construction, while the 3rd one will be occupied only 2 years later. There is no... Last reply: Marcus Sheffer, May 10, 2012, 3:39 pm |
|
AppealsNC-2009 EAp2: Minimum Energy Performanceposted by J Morrison on May 7, 2012, 11:59 pm
I have been told by our very reputable Design firm that is is not unusual to have two design appeals on the EA credit 1 and prerequisites. I am losing faith and would like to know what everyone... Last reply: Marcus Sheffer, May 8, 2012, 9:16 am |
|
Separating High Energy Consumer as a "Process Load"NC-2009 EAp2: Minimum Energy Performanceposted by Todd LaFreniere on Apr 26, 2012, 5:38 pm
I have a project that is just starting and we have a somewhat unique situation. The building is a 2-story office building and the computers being used within the building are server grade... Last reply: Marcus Sheffer, May 3, 2012, 12:13 pm |
|
eQuest for LEED ExperienceNC-2009 EAp2: Minimum Energy Performanceposted by Sam Watters on May 2, 2012, 12:34 pm
Hello, My project team is looking into doing the energy modeling for a project in house, and I am wondering if anyone has a sense of how much experience is necessary to learn to use... Last reply: Marcus Sheffer, May 3, 2012, 1:59 am |
|
Process Energy for Manufacturing facilityNC-2009 EAp2: Minimum Energy Performanceposted by Johnathan Woodside on May 2, 2012, 11:08 am
I have seen several posts pertaining to... Last reply: Marcus Sheffer, May 3, 2012, 1:53 am |
|
DOAS for baseline modelNC-2009 EAp2: Minimum Energy Performanceposted by Katherine Ann Resurreccion on Apr 26, 2012, 3:55 am
If the proposed HVAC design has DOAS that delivers OA to all... Last reply: Katherine Ann Resurreccion, Apr 26, 2012, 7:35 pm |
|
ASHRAE 90.1 does not apply to portions of BuildingNC-2009 EAp2: Minimum Energy Performanceposted by Kai Andrade on Apr 24, 2012, 6:17 pm
A portion of our new building will be dedicated to maintenance of large vehicles (large trucks, earth movers, etc) and is priimarily industrial in nature. These areas are provided with exhaust... Last reply: Kai Andrade, Apr 25, 2012, 2:45 pm |