WE C1, Option 2, Path 2 submittal requirements
NC-2009 WEc1:Water efficient landscapingposted by SmithGroup BG+LU FW on
If a site will have no irrigation installed (permanent or temporary) is one still required to complete the baseline and design case information as part of the submittal requirements (tables WE c1-1
Building Footprint
NC-2009 PIf2:Project Summary Detailsposted by Josh Sawyer on
I am working on a project that already has a building located on the site. We are adding a new building addition to the site.
recovered fiber
NC-2009 MRc4:Recycled contentposted by Teresa Bell on
When the recycled content of a wood core material is listed as % pre-consumer, % post-consumer and % recovered fiber, is the recovered fiber to be included in the pre-consumer percentage? The defi
porous or non-porous material
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Noriko Nagazumi on
Hi, Our project is located in Japan. We usually classify tiles and stones to porous materials in our country. Porous material is defined as follows according to SCAQMD Rule1168.
Golf Courses
NC-2009 SSc2:Development density and community connectivityposted by Jennifer Berthelot-Jelovic on
Has anyone tried submitting a golf course as a Park or Service? Or would this be seen as a gym/workout facility?
Resubmit After Dening
posted by Chinthaka Jagodaarachchi on
Hi.. I have got a design credit denied in design final review after submitting clarifications to the design preliminary review comments.
PV's special rate
NC-2009 EAc2:On-site renewable energyposted by Michela Tedeschi on
Hello all, As I understand, all the energy produced by photovoltaic panels which is not used for the building (then fed into the grid) can not be counted for the purposes of credit EAC2.
Street trees
Pilot-Credits PC14:Walkable Streetsposted by Roland Le Roux on
Some of our buildings are located in the historical districts of Paris (without necessarily being historical buildings themselves).
Correction
posted by Paula Melton on
Thanks to feedback from an alert reader, I just updated the article to reflect the fact that Green Globes was not developed by the Green Building Initiative.
Help, please
posted by Stefanie Hoffmann on
Dear all, Having worked on a LEED EBOM project in Helsinki, Finland, where we were unfortunately not able to fulfill one of the prerequisites (EAp2), motivated me to dedicate my bachelor's thesis t