Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

How to model slab-on-grade floor in simulation program

NC-2009 EAp2:Minimum Energy Performance
posted by  lin wang  on 

As ASHREA90.1-2007 shown,the slab-on-grade floor of baseline building shoud be modeled by the parameter of F-factor.But the parameter to model slab-on-grade floor in program eQuest is U-value or pr

1
Wed Mar 16, 2011, 5:59 pm

ASHRAE Mandatory Provisions for Power

NC-2009 EAp2:Minimum Energy Performance
posted by  Carolina Vergnano  on 

I'm working on LEED for a stadium, and we have a bit of trouble interpreting requirements of ASHRAE 90.1 -2007 section 8. The project will have a tranformer that will filter the high voltage.

1
Wed Apr 13, 2011, 12:33 pm

Exposed slopes

CS-2009 SSp1:Construction Activity Pollution Prevention
posted by  Gabriela Hernández Castillo  on 

If the construction site is really "active", that is to say there is earth movement everyday and the slopes are changing every couple of days, do we need to protect them everysingle day? According

1
Tue Mar 29, 2011, 12:55 am

Low Flow Kitchen Sink

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Jay Murray  on 

We are renovating and entire floor (43,000 office space square feet).

1
Fri Mar 18, 2011, 5:38 pm

Non-structural wall resurfacing

Schools-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  James Ketter  on 

Our project has existing non-structural plaster walls that will be reused in place.

1
Tue Mar 29, 2011, 1:45 pm

Removal % in LEED reference guide table.

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Emmanuel Pauwels  on 

If I understand correclty, we can use the table in the reference guide with several BMPs to determine the removal efficiency.

1
Tue Mar 29, 2011, 8:42 pm

GIB prereq 4 for projects registered during stage 2

General forums
posted by  Jutta Berns  on 

we have a LEED ND project in South Africa, which we registered early this year at Stage 2.

1
Thu Apr 7, 2011, 12:42 am

Dance studio views

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Norma Lehman  on 

this dance studio has windows that provide a "connection between indoor spaces and outdoors" with views to the sky.

1
Thu Apr 14, 2011, 12:32 pm

Narrative on Data Collection

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Xun Jia  on 

Can anyone help with the text box asking for a description of the data collection methodology etc.? We are using option 3. The survey went out to everyone and we got 66% participation.

1
Tue Mar 29, 2011, 2:15 am

Define "no new parking" - project site is a former parking lot

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Jill Ziegler  on 

My project is being built on an old parking lot in a previously developed, campus-style site. The LEED site boundary will be drawn around this building only.

1
Thu Mar 17, 2011, 9:05 pm