Forum quick links
How to model slab-on-grade floor in simulation program
NC-2009 EAp2:Minimum Energy Performanceposted by lin wang on
As ASHREA90.1-2007 shown,the slab-on-grade floor of baseline building shoud be modeled by the parameter of F-factor.But the parameter to model slab-on-grade floor in program eQuest is U-value or pr
ASHRAE Mandatory Provisions for Power
NC-2009 EAp2:Minimum Energy Performanceposted by Carolina Vergnano on
I'm working on LEED for a stadium, and we have a bit of trouble interpreting requirements of ASHRAE 90.1 -2007 section 8. The project will have a tranformer that will filter the high voltage.
Exposed slopes
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Gabriela Hernández Castillo on
If the construction site is really "active", that is to say there is earth movement everyday and the slopes are changing every couple of days, do we need to protect them everysingle day? According
Low Flow Kitchen Sink
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Jay Murray on
We are renovating and entire floor (43,000 office space square feet).
Non-structural wall resurfacing
Schools-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by James Ketter on
Our project has existing non-structural plaster walls that will be reused in place.
Removal % in LEED reference guide table.
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Emmanuel Pauwels on
If I understand correclty, we can use the table in the reference guide with several BMPs to determine the removal efficiency.
GIB prereq 4 for projects registered during stage 2
posted by Jutta Berns on
we have a LEED ND project in South Africa, which we registered early this year at Stage 2.
Dance studio views
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Norma Lehman on
this dance studio has windows that provide a "connection between indoor spaces and outdoors" with views to the sky.
Narrative on Data Collection
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Xun Jia on
Can anyone help with the text box asking for a description of the data collection methodology etc.? We are using option 3. The survey went out to everyone and we got 66% participation.
Define "no new parking" - project site is a former parking lot
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Jill Ziegler on
My project is being built on an old parking lot in a previously developed, campus-style site. The LEED site boundary will be drawn around this building only.