Forum quick links
Innovation in Design: Design or Construction?
NC-2009 IDc1:Innovation in Designposted by Lew Bonadies on
We are considering three Innovation in Design credits for a supermarket in LEED 2009 for Retail: a Food Donation program to reduce solid waste; an in-store and online Education program; and a Green
Case 2 of SSc5.2
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Mike Phelps on
The language for this case specifies open vegetated space "adjacent" to the building. Does adjacent mean next to the building or can it be vegetated open space near to the building as well?
Blow out water closets in LEED for Retail
NC-2009 WEc3:Water Use Reductionposted by Anders Olson on
The LEED NC for Retail rating system indicates a baseline performance of 1.6 gallons per flush (gpf) for all water closets except blow out fixtures, which are assigned a baseline performance of 3.5
Survey
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Adriana Hansen on
In approach 2 inside the option 3 of this credit we had some uncertainties on how we could proceed with the survey and sampling process.
No Furniture in project scope
CI-2009 MRc4:Recycled Contentposted by Marie Mihalik on
Can this credit, or MRc5, be attempted without CSI Division 12 Materials Cost or Furniture items included? The Furniture was not in the Architect's or the Contractor's scope of work.
EAc1-Overshadowing(LEED v2.2)
NC-2009 EAc1:Optimize Energy Performanceposted by gwenedd murray on
ASHRAE's table G3.1, section 5(a), states the baseline model should not shade itself.
Trash compactor
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Gabriela Hernández Castillo on
If a project is implementing a trash compactor as an alternate method, will this comply with the prerrequisite requirements?
LEED NC SSp1 Is Esc always required? All phases?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Joseph Greco on
We are working on a phased construction project for the (major) renovation of a small single-story City owned recreation center (+/- 1200 sf) and associated site improvements.
Latest a CxA can be brought into project
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Judy Peterson on
My client was late in committing to LEED for an interior renovation, so is this prerequisite achievable if commissioning was not incorporated into the project until the construction phase?
Future Route Planned
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Lisa VandeVoort on
Our site is located in a new development that does not have public transit servicing it currently, but there are future plans to add a route here.