Forum quick links
Questions about multiple buildings certification (small complex)
posted by Camelot Colindres on
Hello everyone, I am new in the simulation of LEED proyects. I want know if any can help me to answering a doubt.
Red Alert on Equipment Metric Review Trend
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Jenny Carney on
All, we've seen a trend from the review side that we want to share so that folks can be prepared.
Medical Equipment: Pilot Credit, LEED Point, Incentive Programs?
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by Catherine Pana on
I work for GE Healthcare and we recently introduced a new CT (Cat-Scan) Scanner to the market that is 60% more electrically efficient.
Gender Ratio Impact on WE p1 and c3 Water Calculations
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by J Douglas Dietrich on
We understand from experimenting with the forms that the results are influenced by the male to female ratio. Are all projects required to use a 50:50 ratio?
Pilot Credit #45
Pilot-Credits SSpc45:Site assessmentposted by Jill DeMarotta on
I think this is a good credit.
Synthetic turf roofs?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Nelina Loiselle on
Would a "green" roof done with synthetic turf apply to this credit under the green roofing option?
Determining Baseline System Type
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Rebekah Burke on
I am trying to correctly determine the baseline system for my LEED energy model. I have a 7-story hotel building so it will either be System 1- PTAC or System 2 –PTHP based on ASHRAE 90.1-2007.
Performance period - general info
posted by Andy Plogsted on
I have not been able to find out much info on perf periods, so I have a few questions.
NC Major Renovation with minimal site disturbance
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Monika Mickute on
Dear LEEDUsers, We are working towards certifying our own office building (an existing 50 year old, single story structure of ~7,000 sf on a 0.64 ac lot).
WC average flow rate for residential use
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Udana Ratnayake on
we are working on a hotel project where the guest rooms are provided with dual flush (4.5L/3L) WCs. no urinals are provided.