Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED CS international projects

General forums
posted by  Susann Geithner  on 

Here are the ACP Documentation Guidance for Projects outside the U.S. for LEED CS 2009 projects http://bit.ly/rXfh1q

0

Alternative Compliance path for international projects

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Susann Geithner  on 

The USGBC has published a draft for additional guidance for international projects. That includes alternative compliance paths and even additional LEED online forms for international projects.

0

Alternative Compliance path for international projects

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Susann Geithner  on 

The USGBC has published a draft for additional guidance for international projects. That includes alternative compliance paths and even additional LEED online forms for international projects.

0

Alternative Compliance path for international projects

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Susann Geithner  on 

The USGBC has published a draft for additional guidance for international projects. That includes alternative compliance paths and even additional LEED online forms for international projects.

0

Alternative Compliance path for international projects

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Susann Geithner  on 

The USGBC has published a draft for additional guidance for international projects. That includes alternative compliance paths and even additional LEED online forms for international projects.

0

Alternative Compliance path for international projects

NC-2009 IEQc2:Increased Ventilation
posted by  Susann Geithner  on 

The USGBC has published a draft for additional guidance for international projects. That includes alternative compliance paths and even additional LEED online forms for international projects.

0

Sucess with prescriptive method and weighted average Tvis?

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Jill Perry, PE  on 

There have been a few post here about using a weighted average Tvis for the prescriptive method in the case where the design has two or more Tvis values in the same plane.

1
Thu Feb 16, 2012, 10:18 pm

PC 9 - Open & Connected Community

Pilot-Credits PC9:Street Network
posted by  albert kovacik  on 

We were on the cusp of Gold level until our review came back with several points deducted from our energy model.

1
Wed Dec 7, 2011, 2:43 pm

Public Transportation Park and Rides

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Wendy Gibson  on 

Many tenants in our building use public transportation park and rides. They drive to a specific location, park their car and get on public transit for the rest of their commute.

1
Sun Nov 20, 2011, 1:55 pm

PC 29 - Housing & Job Proximity

Pilot-Credits PC29:Housing and Jobs Proximity
posted by  albert kovacik  on 

We were on the cusp of Gold level until our review came back with several points deducted from our energy model.

0