Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

GIBc8—Stormwater Management

General forums
posted by  Wayne Ding  on 

The credit requires "the percentile rainfall event is the total rainfall on a given day in the record that is greater than or equal to X percent of all rainfall events over a 20-to 40+-year period"

1
Thu Jun 2, 2011, 10:22 pm

Athena Eco Calculator - Cement replacement

Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materials
posted by  Kelly Roberts  on 

Can we scale our square footage inputs linearally to account for cement replacement in excess of 20%?

1
Fri May 20, 2011, 7:24 pm

Which cost of materials to use?

Schools-2009 MRc5:Regional Materials
posted by  Maya Karkour  on 

Dear all, The retail price of a certain product is $15 (anyone can buy it from the supplier for $15).

1
Mon May 23, 2011, 11:41 am

Multiple Occupancy

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Robert Barrett  on 

I would assume that in a multiple occupancy CS building, the shower and changing room(s) would need to be in a location that is readily accessible to all, like common space.

1
Wed May 25, 2011, 2:46 am

Overlapping

EBOM-2009 IOc3:Documenting sustainable building cost impacts
posted by  Hatice G.  on 

Can the performance period overlap the historical year? Or should the historical years end before the performance period starts?

1
Wed Jun 8, 2011, 9:22 pm

Regional Materials

Schools-2009 MRc5:Regional Materials
posted by  Rebecca Griffith  on 

When calculating distance between the manufacturing plant & the project site, is the distance I should use, actual travel distance by land, or by "how the crow flies"?

1
Mon May 23, 2011, 2:47 pm

LEED certification for factories

General forums
posted by  Tristan Roberts  on 

Rosamaria, I can't immediately think of any well-known examples, but it has been done and is being done.

0

LEED for Retail: Qualifying for Option 4 (Parking Capacity)

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  John Klein  on 

LEED for Retail Option 4 Path 1 states "size parking capacity must meet but not exceed minimum local zoning requirements".

1
Fri Jun 24, 2011, 10:42 pm

MRc4 forum and information

General forums
posted by  Tristan Roberts  on 

Hi Nancy, I see that you're a LEEDuser member, which is great since you are new to LEED.

0

Open plan (individual workstations) with access to thermostat

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Karen Stewart  on 

We have an open plan office area that contains 24 workstations. There are 3 thermostats that control the temperature in this open office plan area.

1
Tue May 24, 2011, 4:31 pm