Topic | Recent |
---|---|
Reviewer's comment on MPR2NC-2009 MPR2: Must be a complete, permanent building or spaceposted by Eric Bautista on Sep 14, 2016, 12:11 am
I am handling a new LEED building addition horizontally attached to a non-LEED existing building. We have submitted for Preliminary review and here are the comments from the reviewer (I put... |
|
2 buildings but cannot function independently without the otherNC-2009 MPR2: Must be a complete, permanent building or spaceposted by Miriam Ramirez Baumgarten on Sep 7, 2015, 6:37 pm
Hi, Last reply: Miriam Ramirez Baumgarten, Aug 8, 2016, 2:28 pm |
|
Permanent Land /Space Requirement (MPRPp2)NC-2009 MPR2: Must be a complete, permanent building or spaceposted by al-emran hossain on Mar 27, 2016, 7:48 am
Hi LEED Expert , Last reply: Tristan Roberts, Mar 27, 2016, 6:49 pm |
|
Single Building Certification_LEED New Construction 2009NC-2009 MPR2: Must be a complete, permanent building or spaceposted by Aswin M on Dec 23, 2015, 5:42 am
We have a Garment factory project that has three blocks with connectivity bridge. Last reply: Jon Clifford, Dec 30, 2015, 12:06 am |
|
Resort Hotel and CondoNC-2009 MPR2: Must be a complete, permanent building or spaceposted by John Zehren on Nov 30, 2015, 6:33 pm
I am working on a 7 story resort hotel and condo under LEED 2009 NC. We just received word that the 9 Condos on floors 6 and 7 will be finished at a future date. Floors 1-5 are under... Last reply: Christopher Schaffner, Dec 17, 2015, 7:01 pm |
|
Office tower on a shopping center "plinth"NC-2009 MPR2: Must be a complete, permanent building or spaceposted by Ricardo Sá on Nov 16, 2015, 6:40 am
I'm working on a project that consists of an office building tower that will be erected on top of a shopping center built 20 years ago. If we consider the total building footprint for the... Last reply: Ricardo Sá, Nov 30, 2015, 11:28 am |
|
Tenant Guidelines for CS spaces within NCNC-2009 MPR2: Must be a complete, permanent building or spaceposted by Melanie Silver on Aug 27, 2015, 11:15 am
We are working on a large residential project that has two very tiny retail spaces at the base (one less than 500 sf, and the other about 1500 sf). The residential portion is NC, and we are... Last reply: Melanie Silver, Nov 30, 2015, 10:13 am |
|
Canopy to building with wall opening (is it a "complete bldg")?NC-2009 MPR2: Must be a complete, permanent building or spaceposted by John Lee on Aug 31, 2015, 6:27 pm
We have a project that is an existing canopy converted into a building without a 15' wide wall on one side. There will be a 10'x15' enclosed office inside this building. Would this be... Last reply: Tristan Roberts, Nov 26, 2015, 10:52 pm |
|
Major renovationsNC-2009 MPR2: Must be a complete, permanent building or spaceposted by Veronica Reed on Sep 30, 2015, 12:54 pm
Hello, what level of intervention would constitute as "Major Renovation"? we are renovating a building from the 1890's and need to preserve the shell, interior partitions,... Last reply: Christopher Schaffner, Sep 30, 2015, 2:04 pm |
|
Residential high rise with school at the baseNC-2009 MPR2: Must be a complete, permanent building or spaceposted by Ilana Judah on Jul 22, 2015, 12:55 pm
We are designing a high-rise residential tower with a school and retail area at the base. There is some entry and service space serving the residential tower on the cellar and ground floor levels... Last reply: Ilana Judah, Aug 5, 2015, 10:32 am |