NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Omar Elrawy on
I need to know what is meant by the "Multiple Mode" mentioned in the the scorecard form under the "Lighting Control Type"?
Individual thermal comfort controls
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Regina Gul on
We are working on a LEED 2009 C&S project.
Retention Tank
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Anna Korinkova on
Dear Leedusers, our project will install a retention tank which will collect storm water from the whole LEED area. The retention tank will provide water for flushing toilets and watering greenery.
Hotel lotions and shampoos EBOMv2009
EBOM-2009 IEQp3:Green Cleaning Policyposted by Tyra Sorensen on
A hotel project going after Green Cleaning as an ID credit. What all needs to be included in the policy? Do the lotions, shampoos, and conditioners need to be included? What about the paper on the
FSC Material Used, Mfg Not Chain of Custody
Schools-2009 MRc7:Certified Woodposted by Erin Storlie on
Our Millwork (Cabinet) Manufacturer purchased FSC material, but was not COC certified.
Water requirements much higher in LEED
NC-2009 WEc1:Water Efficient Landscapingposted by Mike D on
The LEED form gives a certain amount of water based on the calculations.
Daily or monthly?
NC-2009 WEc1:Water Efficient Landscapingposted by Mike D on
The table on the form calculates the irrigation in July (month with higest demand). Is this the irrigation requirement for the whole month or for one day during July only? Thanks!!
Number of simulation models
CS-2009 EAp2:Minimum Energy Performanceposted by Lucie Cervena on
We are working on an eQuest model of an extensive project that is goinig to be certified as „one building“ with the total gross square footage of 1,670,000 sf.
Emergency lights
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Saju Varghese on
Do emergency lights need to be included in this list?
LEED for a mixed use building
posted by Phyllis Biagi on
We have a client who is looking at a project which will consist of four stories of apartments over retail.