ASHRAE 62.1 - 2007 section 5.9 Particulate Matter Removal

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Carolina Vergnano  on 

To comply with the section 5.9, Particulate Matter Removal, the HVAC system needs to have a filter or an air cleaner having a minimum efficiency of MERV 6. Does this filter needs exactly be insid

2
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Thu May 5, 2011, 12:25 pm

WEp1 Scope or Space?

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Michelle Bracewell-Musson  on 

The Bird's Eye above states only fixtures within the project 'SCOPE' which would mean that a project that does not include plumbing fixtures, would be exempt.

5
Research Knowledge Manager: Healthcare Sustainability
pw
LEEDuser Basic Member
36 thumbs up
Wed May 4, 2011, 7:06 pm
2
Consultant
YRG sustainability
LEEDuser Basic Member
155 thumbs up
Wed May 4, 2011, 5:25 pm

Water Use in a Horizontal Expansion

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Neil Rosen  on 

What do you do if you are constructing a horizontal expansion but you have no plumbing fixtures in the expansion?

5
Sustainability and Resilient Design Practice Director
Jacobs
LEEDuser Premium Member
15 thumbs up
Wed May 4, 2011, 4:55 pm

commissioning performance period

EBOM-2009 EAc2.2:Existing Building Commissioning—Implementation
posted by  Pablo Fortunato Suarez  on 

This is for a 1st time EBOM project (not recertification). If Six Sigma Projects were initiated 5 years prior to LEED registration but implemented every year thereafter until the present time: 1)

3
Default Avatar
Principal ESD Consultant/Architect
GreenArc Sustainable Building & Architecture
LEEDuser Basic Member
170 thumbs up
Wed May 4, 2011, 4:33 pm

Authority having Jurisdiction

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Diego Prada  on 

We are working on a CS naturally ventilated office Building.

3
Management Consultant LEED AP BD+C, PMP
Green Building & LEED
LEEDuser Basic Member
21 thumbs up
Tue May 3, 2011, 5:40 pm

How to keep birds away from PV panels

Schools-2009 EAc2:On-Site Renewable Energy
posted by  Gendel Metlitsky  on 

How to keep birds away from PV panels on the roof - any suggestions?

2
Chief Environmental Officer
Alpenglow Advisory
LEEDuser Basic Member
44 thumbs up
Tue May 3, 2011, 12:38 pm

Lighting Power Density

NC-2009 EAp2:Minimum Energy Performance
posted by  Guillermo T. Adamo  on 

Hi, im working in the design of a petrol station persuing LEED certification.

5
Default Avatar
Principal : Energy / Electrical Engineer
BuildingPhysics South Africa
LEEDuser Basic Member
94 thumbs up
Mon May 2, 2011, 10:53 pm
3
Default Avatar
Director, Sustainability Programs
Kilroy Realty Corporation
LEEDuser Basic Member
49 thumbs up
Mon May 2, 2011, 3:40 pm

Condensate meters

EBOM-2009 WEc1:Water Performance Measurement
posted by  Andrea Marzullo  on 

1. Is anyone using condensate for make-up to their cooling tower? 2. If so, what size and type of meter is being used? 3.