Hotel Guest Villas Need OA measurement device?

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  John Covello  on 

Hello, I am with a hotel project that will have 80 odd guest villas. Most will be between 90 M2 (968 sq ft) and 130 M2 (1400 sq ft) in size.

2
Default Avatar
HVAC consultant
Optimized Systems
LEEDuser Basic Member
19 thumbs up
Mon Nov 11, 2013, 6:37 pm

task lighting

posted by  Vivian Wan  on 
5
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Mon Nov 11, 2013, 2:39 pm

Help determining Baseline System for Model

CS-2009 EAp2:Minimum Energy Performance
posted by  Brian Salazar  on 

Hello! My first post here on LEED User. We are modeling an existing building which has had its rooftop units replaced "in kind", so they are more efficient units, but the same general makeup.

9
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Fri Nov 8, 2013, 10:00 pm

LEED NC energy model for spaces occupied by other tenants

NC-2009 EAc1:Optimize Energy Performance
posted by  Cory Ferguson  on 

We are designing a 4 story building where the owner will occupy 3-1/2 floors of the building and another tenant will at some point occupy the remaining portion.

2
Default Avatar
President
Weatherby Design & Co. Engineers
LEEDuser Basic Member
67 thumbs up
Fri Nov 8, 2013, 9:03 pm

Timing of surveys

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  American University  on 

We are dealing with the challenge of surveying commuters on a college campus.

3
Founding Parnter
eco evolutions
LEEDuser Basic Member
3 thumbs up
Fri Nov 8, 2013, 7:28 pm

Indirectly Conditioned Bathrooms

NC-2009 EAc1:Optimize Energy Performance
posted by  Phillip Cook  on 

I am using IES VE to model hotel type rooms that each have a separate bathroom. The bathrooms do not have any heating equipment, cooling equipment or thermostats in them.

9
Fri Nov 8, 2013, 5:51 pm

Circulation space Ventilation

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Mike D  on 

Review comments have asked us to include circulation space in our VRP calculator. However, the corridors in the building will not be served by direct air supply.

4
Default Avatar
LEED AP
ABUD Engineering Ltd.
LEEDuser Basic Member
34 thumbs up
Fri Nov 8, 2013, 4:44 pm

Statement Of Energy Performance valid for France ?

EBOM-2009 EAc6:Emissions Reduction Reporting
posted by  florian Beauchet  on 

Hi, I'm a french engineer and I'm wondering if the SEP considers the region of the study. Indeed my site is in France, thus does the GHG emissions result use french emission factor ? Same questi

2
Fri Nov 8, 2013, 7:31 am

Flush Out using exhaust fans / natural ventilation

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Maya Karkour  on 

Dear All, Our project is aiming for the Flush-out option of this credit. 1) For the car parking (on the Ground Level), the air is exhausted by dedicated exhaust fans as per ASHRAE 62.1.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Thu Nov 7, 2013, 9:33 pm

Tenant Sales or Lease Agreement

General forums
posted by  Julie Hendricks  on 

I have several clients that are nearly refusing to provide a copy of their lease agreements because of concerns over confidentiality.

3
President
Sage Building Revival
LEEDuser Premium Member
113 thumbs up
Thu Nov 7, 2013, 9:30 pm