Forum quick links
Proposed Vs Baseline
NC-2009 EAp2:Minimum energy performanceposted by PAWAN DAHIWAL on
My proposed case VAV does not have parallel fan power boxes.
LPB of Subway Station
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Marcio Alberto Casado Pereira on
Dear all, This building has a roof structure that goes beyond the property line in order to shade the sidewalk next to it. It's a public building, that's why.
Master site / individual projects templates
posted by Marcio Alberto Casado Pereira on
Dear all, What is the procedure in order to submit a multipe building project since LEED online is not completely ready for it?
Interior non-load bearing de-mountable partitions
NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Taimor Farid on
Hi All Are interior partitions (non load-bearing, demountable) considered fixtures/ fit-out materials? I.E. are they exluded from this credit?
Would Bottled Water count toward the sustainable food credit?
EBOM-2009 MRc5:Sustainable purchasing - foodposted by Cara Koepf on
Our project is a state office building and the only purchased food is bottled water. There is also the food ordered for employee annual recognition ceremony.
SEER of split AC unit
NC-2009 EAp2:Minimum energy performanceposted by Jatuwat Varodompun on
In Thailand, there is no SEER testing as indicated for a small air conditioners in table 6.8.1A of ASHRAE 90.1 standard. Only EER is normally required to be tested here.
Train Storage/Parking Deck – “Covered Parking”
NC-2009 SSc7.1:Heat island effect - nonroofposted by Kellie Hollenbeck on
We have a light rail transit project that we have designed so that the train storage yard is located beneath a 200+ space concrete parking deck with the LEED project building located on the deck.
Exemplary Performance Interpretation
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Cassandra Kail on
I am hoping to get an exemplary performance credit for Public Transportation Access.
Measurement Method - Submittal Semantics
CI-2009 IEQc8.1:Daylight and views - daylightposted by Jeremy Theodore on
From anything I have read, Credit IEc8.1 is a design credit, which would obviously suggest it be submitted with the "design" submittal in a split submittal. It however offers the option to measure
USGBC BPP
Pilot-Credits PC38:Advanced Utility Trackingposted by Sara Aschliman on
How do i as the Homeowner, "enroll in the USGBC Building Performance Partnership (BPP) for all applicable utility accounts, prior to submitting for LEED Certification."?