Enhanced Cx - Submittal reviews - HVAC&R only?

NC-v4 EAc1:Enhanced commissioning
posted by  André Harms  on 

In reference to the V4 LEED Reference Guide for Building Design and Construction, Enhanced Commissioning section: In the Step-by-Step guidance, “Step 4.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 2, 2016, 4:01 pm

ASHREA 0-2005

NC-v4 EAc1:Enhanced commissioning
posted by  Amrit Kaur  on 

Any one knows where I can get the referenced 0-2005 standard? officially its no longer available from ASHREA and superseded by 0-2013. Any idea how different they may be?

2
Regional Director
Horizon Engineering Associates
LEEDuser Premium Member
40 thumbs up
Fri Sep 2, 2016, 3:52 pm

Energy Star eligibility for very large Display Monitors

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Harry Flamm  on 

Nowhere on the Energy Star site can I find out if 75" wide and larger Professional Display Monitors (such as Samsung or NEC for conference rooms) are eligible or not for an Energy Star rating. I h

2
Fri Sep 2, 2016, 1:44 pm

Basement Levels in ASHRAE 90.1 Energy Models

CS-2009 EAp2:Minimum Energy Performance
posted by  Ciaran McCabe  on 

Hi, I am modelling a 6 storey office building which also has a basement car park.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 2, 2016, 1:41 pm

Occupants / users of public park

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Deborah Lucking  on 

Our project includes the creation of a park, and construction of a pavilion with restrooms for park users. The challenge - how do we calculate the number of FTEs using these restrooms?

5
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Thu Sep 1, 2016, 8:50 pm

Operable Windows & Mechanical Ventilation

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Charalampos Giannikopoulos  on 

Would an operable window be an eligible type of thermal comfort control in a mechanically ventilated building or would such a control require that the building is naturally ventilated?

6
Thu Sep 1, 2016, 1:58 pm

Combine options

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Leandro Silva  on 

We are certifying a Project and we are preparing the documentation for the EQ credit 3.2 Construction Indoor Air Quality Management Plan – Before Occupancy.

3
Default Avatar
Project Manager
McKissack and McKissack
LEEDuser Basic Member
0 thumbs up
Thu Sep 1, 2016, 1:54 pm

Corrective Actions and Sub-metering

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Jatuwat Varodompun  on 

For the submetering, we can just provide the box that allow the tenant to install the meter, right?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Aug 31, 2016, 11:08 pm

Existing building reconstruction and expansion

NC-2009 EAp2:Minimum Energy Performance
posted by  Deborah Lucking  on 

Questions for the experts: We have a project that will have some floor areas demolished and reconstructed/renovated, and also some new construction (less than 20%). 1.

4
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Wed Aug 31, 2016, 8:38 pm

Functional, usable spaces

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Jeannie Rueter  on 

What is the definition of "functional, usable spaces"?

3
Wed Aug 31, 2016, 7:34 pm