Forum quick links
Non Potable Water Source Use
EBOM-2009 WEc4:Cooling tower water managementposted by Rajesh Ghorla on
What QC process can be added to identify variances from Standard Approach and what measures can be take.
Spaces smaller than 3000ft2
posted by Emmanuel Pauwels on
When the building entrance space is less than 3000 ft2, ASHRAE does not require a vestibule. (§ 5.4.3.4 Exception g) Is this correct?
adhesives for wall covering/wall paper
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Benjie Herrera on
Where do we classify in the IEQ 4.1 list the adhesives to be used for wall covering/wall paper?
COC Invoice for LEED Core & Shell v2.0 - MRc6
CS-2009 MRc6:Certified woodposted by Juan Sergio Simborio on
Hi ! I need some help on FSC documentation. Our project is registered under the LEED Core & Shell v2.0 rating system.
FSC Mix
Schools-2009 MRc7:Certified woodposted by Ema S on
Our cabinets are 70% FSC Mix...our understanding is that FSC mix wood is "mixed source products that are a blend of FSC100%, recycled and or controlled fiber". The LEED credit form states that only
enlosed smoking room outside the building
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Erin Holdenried on
Hello, I have a project that does not allow smoking within the building. However, there are small one room kiosks outside the building that allow smoking.
Automatic Shades in the Option 2: Prescriptive Method
NC-2009 IEQc8.1:Daylight and views - daylightposted by Nelina Loiselle on
The credit language for c8.1 is states: "However, designs that incorporate view-preserving automated shades for glare control may demonstrate compliance for only the minimum 0.150 value" I'm I c
Option1 or Option 2
ND-v2009 NPDp3:Connected and open communityposted by Noriko Nagazumi on
Hi, Our project is located on a 83 acre site with internal streets.
Skateboard Wall Panels
CI-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Holly Nichols on
I am hoping to use a product that uses bamboo end cuts from the waste stream of another manufacturing process as wood wall panels.
Campus setting uploading refrigerant data LEED letter template
NC-2009 EAp3:Fundamental refrigerant managementposted by John Covello on
Hello, This is a sort of how to LEED Online question. We have a resort campus setting. There will be several different sizes of guest villas as well as public spaces and staff facilities.