Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

What to do?

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Paola Figueiredo  on 

Our project team is working on LEED EBOM certification of an industrial compound, and there is a question we are not so sure about and we believe one of you may be able to help.

1
Thu Feb 16, 2012, 10:28 pm

What if there's no A/C.

NC-2009 EAp2:Minimum Energy Performance
posted by  Patana Rattananavathong  on 

What if the project don't have any A/C? there are 3 retails, 1 wc. All are separated buildings. What should I do with ASHRAE 5.4, 6.4 and for energy simulation?

1
Mon Oct 10, 2011, 4:09 pm

Glass Piping

Pilot-Credits PC2:PBT Source Reduction: Dioxins and Halogenated Organic Compounds
posted by  David Weimann  on 

Dear Brendan, note my comment from June of this year. When is the next review of the credit and when will it be updated to include glass piping? Thank you.

1
Fri Oct 14, 2011, 9:47 am

Pilot Credit 43 ISO 14044

Pilot-Credits PC43:Certified Products
posted by  Bruce Maine  on 

The USDA Forest Products Lab generated an EPD in conformance with ISO 14044. Would this generic, non-product specific documentation qualify for Pilot Credit 43 or LEED 2012?

0

Regional Materials - raw material

NC-2009 MRc5:Regional Materials
posted by  Felipe Duran  on 

Hello, we are working on a project that aims to get the LEED NC-2009 certification. We used a stone removed from the site to compose some walls, and therefore has no cost.

1
Mon Nov 21, 2011, 3:21 am

Hallways in Multi Family

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Joseph Blanco  on 

Can anyone tell me if Hallways would be included in a multifamily scenario. Typically this lighting is always on or on a timer.

1
Thu Oct 27, 2011, 5:07 pm

Using a water table tank as a retaining method for compliance

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Gabriela Hernández Castillo  on 

Our project is capturing rainwater and sending it to a water table tank (I don't know if this is the correct term, it is the tank that recieves water from the water table below foundations). The t

1
Mon Oct 10, 2011, 7:49 pm

Polished Plaster (Armourcoat Perlata) Categorization in LEED

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  mary ostafi  on 

I recently spent a great deal of time trying to determine where a polished plaster product (Armourcoat Perlata) falls into LEED.

1
Mon Nov 7, 2011, 4:58 am

HVAC Protection

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Patana Rattananavathong  on 

I have a project that don't use any HVAC system. It's all natural ventilation. Is it ok to left the HAVC protection out since there is nothing to protect.

1
Fri Nov 4, 2011, 11:36 pm

Unable to Meet Pre-req during Current Performance Period

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Kristofer Kiszynski  on 

I was wondering what would happen if we failed to meet a prerequisite such as IEQp1. Would we need to restart our performance period after correcting whatever it is that needs to be corrected?

1
Tue Oct 11, 2011, 4:49 pm