Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Vertically attached - vertical expansion

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Garrett Ferguson  on 

I have a 4-5 story non-LEED building that will be adding 4-5 stories to the new project. I'm confused as to why they would require that the addition be of different ownership.

1
Wed Jan 18, 2017, 4:22 pm

LEED project with associated Parking Deck

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Ashley Love  on 

I have a question concerning LEED projects with associated parking decks. If this question has been answered elsewhere, I have not been able to find it, so please point me in the direction!

1
Tue Jan 17, 2017, 6:12 pm

IEQp1 online form - potential error

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Scott McMillan  on 

We are at Design Appeal stage on a core and shell office project - we have been asked to recalculate ASHRAE 62 compliance based on a theoretical office floor layout incorporating meeting rooms, cor

1
Fri Aug 26, 2016, 7:12 am

Option-3: Irrigation Meter Installed

EBOM-v4 WEc1:Outdoor water use reduction
posted by  VISHESH AGARWAL  on 

i am working on the project where project team use the STP Non potable water used for irrigation purpose. so i am reducing the 100% potable water. can i sufficient to achieve this credit.

1
Wed Mar 8, 2017, 11:34 pm

Purchasing- Ongoing

EBOM-v4 MRc1:Purchasing - ongoing
posted by  VISHESH AGARWAL  on 

what percentage of documentation should be required in local food material (100 miles).

1
Wed Aug 31, 2016, 10:04 pm

Calculator Points clarification

Pilot-Credits MRpc102:Legal Wood
posted by  Patrice McVeigh  on 

Can you clarify the number of points available for this ACP? I believe it is 1 but if in the Validation Tap all statements for the point allocations are 'True' then the figure comes to 2.

0

How to simulate qualified area for IEQc8.1 at both 9 am and 3pm

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Cathy W  on 

Our project chose option 1 -simulation. And the simulation result is 84% ROA is qualified at 9 am, 83% ROA is qualified at 3pm. Then I took 83% as a simulation result.

0

Church+Classrooms = Office?

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Charles Shinneman  on 

I have a church that runs extended house 9am-10pm 6.5 days a week has classrooms that are not heavily occupied. In classifying it the occupancy looks more like an office with extended hours.

1
Sat Aug 26, 2017, 3:42 pm

new building

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Bo Slendak  on 

We are currently doing a government facility and the project requires a LEED notebook be kept. Not having done this prior I need some guidance as to what and how to complete.

1
Wed Jan 18, 2017, 4:14 pm

questions about additional HVAC system in kitchen

CS-2009 EAp2:Minimum Energy Performance
posted by  Zhang Peng  on 

Our project is a high rise building, which consists of offices, bank, dining area and so on. Now it is under the LEED V3 CS review.

1
Tue Aug 30, 2016, 1:53 pm