NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Garrett Ferguson on
I have a 4-5 story non-LEED building that will be adding 4-5 stories to the new project. I'm confused as to why they would require that the addition be of different ownership.
LEED project with associated Parking Deck
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Ashley Love on
I have a question concerning LEED projects with associated parking decks. If this question has been answered elsewhere, I have not been able to find it, so please point me in the direction!
IEQp1 online form - potential error
CS-2009 IEQp1:Minimum IAQ Performanceposted by Scott McMillan on
We are at Design Appeal stage on a core and shell office project - we have been asked to recalculate ASHRAE 62 compliance based on a theoretical office floor layout incorporating meeting rooms, cor
Option-3: Irrigation Meter Installed
EBOM-v4 WEc1:Outdoor water use reductionposted by VISHESH AGARWAL on
i am working on the project where project team use the STP Non potable water used for irrigation purpose. so i am reducing the 100% potable water. can i sufficient to achieve this credit.
Purchasing- Ongoing
EBOM-v4 MRc1:Purchasing - ongoingposted by VISHESH AGARWAL on
what percentage of documentation should be required in local food material (100 miles).
Calculator Points clarification
Pilot-Credits MRpc102:Legal Woodposted by Patrice McVeigh on
Can you clarify the number of points available for this ACP? I believe it is 1 but if in the Validation Tap all statements for the point allocations are 'True' then the figure comes to 2.
How to simulate qualified area for IEQc8.1 at both 9 am and 3pm
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Cathy W on
Our project chose option 1 -simulation. And the simulation result is 84% ROA is qualified at 9 am, 83% ROA is qualified at 3pm. Then I took 83% as a simulation result.
Church+Classrooms = Office?
EBOM-2009 EAc1:Optimize Energy Performanceposted by Charles Shinneman on
I have a church that runs extended house 9am-10pm 6.5 days a week has classrooms that are not heavily occupied. In classifying it the occupancy looks more like an office with extended hours.
new building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Bo Slendak on
We are currently doing a government facility and the project requires a LEED notebook be kept. Not having done this prior I need some guidance as to what and how to complete.
questions about additional HVAC system in kitchen
CS-2009 EAp2:Minimum Energy Performanceposted by Zhang Peng on
Our project is a high rise building, which consists of offices, bank, dining area and so on. Now it is under the LEED V3 CS review.