Forum quick links
DBA for HVAC Background Noise
Schools-2009 IEQc9:Enhanced Acoustical Performanceposted by Greengrade User on
Is the 40 dba a direct value for the equipment itself, or is it a net value based on a sound path analysis to the space?
CAV - How to meet section 3.1 requirement
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Srimannarayana NCVK on
Hi, For one of my LEED CI project, air distribution is a CAV system. There is a VFD for AHU though. To document EA c 1.3, i need to meet CPG requirement.
Regularly Occupied Space for a Library?
NC-2009 PIf3:Occupant and Usage Dataposted by Carrie Laurendine on
City Library project. LEED Manual seems too vague, and doesn't seem to address the transient nature of users vs full time office staff.
Zero Emissions Vehicles
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Sheryl Swartzle on
Are all ZEVs considered to have an ACEEE mininum green score of 40?
Stairs
posted by Ema S on
Are stairs counted for in the gross floor area of the project? Our stairs are roofed and covered on all four sides. Thank you,
LEED v4 Sixth Public Comment
posted by Tristan Roberts on
LEEDuser is hosting a forum devoted to the LEED v4 sixth public comment period, with key links, here.
DG Gravel
Schools-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Ema S on
Does DG gravel count as vegetated open space?
WR p3 and EA p3 Building-Level Monitoring
posted by Timothy Nabholz on
Hey all, I have been doing a review of the 6th Public Comment Draft of v4 for BD+C and noticed something that seems a bit strange to me.
Decorative lighting vs. interior lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
We are attempting a certification of an art center under the LEED NC-2009 and we have the following question: - architecture design team is considering including a decorative feature for a special