Rainwater for irrigation
CS-2009 WEc2:Innovative wastewater technologiesposted by Juan Robles on
We are collecting rainwater and using it for maintenance in the common areas. At the same time, we are achieving a 62% potable water use reduction installing low flush fixtures.
Daylighting Calculations Out Of Range
NC-2009 IEQc8.1:Daylight and views - daylightposted by Eesmyal Santos-Brault on
We are working on a mixed use commercial and residential building using OPTION 2: Prescriptive Path where we calculated 0.150
LEED CI parking for company vehicles
CI-2009 SSc3.3:Alternative transportation - parking availabilityposted by Natalie Ng on
The project would like to look into Case 1 option 1. The tenant included carparking spaces into the lease.
Baseline Virtual Energy Rate
NC-2009 EAc1:Optimize energy performanceposted by Nick Morgan on
I am in the process of submitting the LEED templates (2009 NC) for EAp2/EAc1. The building in question has been modeled using Energy Pro and has calculated a baseline virtual energy rate for natur
LEED EB - VERSION 2.0 WE prereq 1
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by Erika Duran on
- HI everyone, I am wondering if anyone could help me get the insight of the version 2.0 of this particular prerequisite.
Air National Guard Traning facility
NC-2009 IEQc8.1:Daylight and views - daylightposted by Tyler Barter on
Has anyone worked on an Air national Guard traning facility and been able to determine which areas are considered regularly occupied?
Walk-off mat size
Schools-2009 IEQc5:Indoor chemical and pollutant source controlposted by Will Britten on
The requirement for walk-off mats is vague in regards to size of mat required.
Stormwater Management
EBOM-2009 SSc6:Stormwater quantity controlposted by Randy Walsh on
Does installation of mechanical filter media into the storm drain help meet this requirement? (Flogard curb filter inlet)
Precipitation Intensity - NOAA Website
EBOM-2009 SSc6:Stormwater quantity controlposted by Randy Walsh on
Looking for Precipitation Intensity. New NOAA Site lets me select Precipitation Intensity and location and a site, but doesn't return any data.
LEED for Schools Case 1 OR Case 2
Schools-2009 IEQc6.1:Controllability of systems - lightingposted by Dana Murdoch on
Can anyone comment on the Case 1 OR Case 2 for LEED for Schools? The letter template make allows you to use EITHER path, not BOTH as is implied in the text above in the LEED User interpretation.