CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Michael E. Edmonds-Bauer on
This might sound strange and totally out of the scope of LEED, but we wanted to check within LEED User since there are so many experts here. There is a project where the tenant has installed some
LEED EB O&M
NC-2009 PIf3:Occupant and Usage Dataposted by Kay Sieck on
I made some changes to my Plf3, gross sq. ft. is 175754, reg. occupied space is 126504 and my unconditioned space is 26663. Since I made these changes my form does not show complete anymore.
LEED GA and LEED AP exam changes
posted by Michael Zhang on
Hi Tristan Roberts- With the development and release of LEED 2012 in Nov.
Multiple bus stops
ND-v2009 SLLc3:Locations with reduced automobile dependenceposted by Martine Desbois on
Eliot is it correct that a bus that has multiple stops within 1/4 mile can on be counted once? Or rather once inbound and once outbound?
Do cubicle partitions count as furniture/durable goods in MRC2?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Jubilee Daniels, MLA, LEED AP O+M on
Calling all experts- in your experience do new cubicle walls/partitions count as "furniture" in LEED EBOM 2009. How about white/cork boards and things of that nature?
Previously developed site definition
NC-2009 SSc2:Development Density and Community Connectivityposted by Jean-Baptiste Noel on
The project we are working on is to be built on a land that has been graded as it is part of a national master plan that defines the plot ratio and creates the buildable plots in advance.
Sum of LPBs = 100% of LCB?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Zonda E. Team on
Dear all, I find these below in contradiction. If so, does anybody know which is correct? Supplemental Guidance to MPR revision 2 (1 Sep 2011) - MPR 3: "3.
Previously developed land
ND-v2009 PIf1:Development Program and Site Typeposted by Tyler Baker on
We have a large piece of land which was formerly single family detached housing.
Pre-rinse valve
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Mike D on
The project has a pre-rinse valve with a flow rate of 1.27gallons per minute. How do I estimate daily uses and duration? Thanks!
Non-contiguous land to associate with LEED boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Julie Blue on
To support this project we installed a geo-thermal system under an existing playing field that is across the street from the new building addition we are certifying.