Forum quick links
LEED Baundary Campus - parking lot
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by gabriel Morales on
We have a campus project consists of 2 towers with retail corporate considered LEED CS and 2 residential towers that are not LEED certified , is underground parking on 5 levels with a design criter
Appeal Design Credits After Construction Review has begun?
posted by Garrett Ferguson on
I have a CS 2009 project where 2 credits were denied in the Design Final Review. We are sitting at 42 points if all goes as planned.
IDF curves
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by MKK LEED on
Hi, I have a NC project in Colombia and the Environmental Authority just have IDF curves since 3 years. I don't have information since 1 and 2 years.
no cooling / using addendums
CS-2009 EAp2:Minimum Energy Performanceposted by Samuel Sura on
Hello, I have two questions: 1) we are working on residential building where its occupied spaces has heating and cooling, but rooms situated on north facade has no cooling system.
LEED v3 CS: IEQ8.1 and 8.2 - How to Calculate Zone Floor Area
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Maggie Hogan Skaug on
This project is a high rise mixed-use office building pursuing LEED Core & Shell certification with no or limited tenant build-out plans.
TAB Report and Calculations
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Tom Liebel on
We have just received a request for additional clarification during our final review of our LEED-EBOM 2009 submission, asking us to confirm the date of our TAB report, and pointing us to the the Ca
NC-2009 SSc2: Development Density and Community Connectivity
NC-2009 SSc2:Development Density and Community Connectivityposted by Bouygues Sustainability on
Hi everyone, We are certifying a Hotel. I want to know if we can count in this credit Option 2 the services offered by the hotel. Txs
Controller Efficiency
NC-2009 WEc1:Water Efficient Landscapingposted by Michelle Rosenberger on
I see several threads attempting to get an answer on how one demonstrates controller efficiency and the most prevalent answer seems to be just use 1 because no other values can be substantiated by
LEED Online v4 for Multiple Buildings on a Campus
posted by Deborah Lucking on
LEED Online v4 was a surprise in more ways than one. The individual projects are now certified under the Master Site, which is certified under the Campus (the old "block"). All well and good.
How does LEED SSc6.1 calculate "Imperviousness"?
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Brian O'Mara on
How does LEED SSc6.1 calculate "Imperviousness"?