Carpet tile approved as acceptable walk-off mat
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Melissa Vernon on
Carpet tile is now an acceptable entryway system per LEED Interpretation Ruling ID#10252 https://www.usgbc.org/leedinterpretations/LISearch.aspx?liaccessid=10252 Carpet tile is a highly desired w
Energy modeling - ASHRAE §G3.1.2.4
NC-2009 EAp2:Minimum Energy Performanceposted by Julien Daclin on
Hi all, We are undertaking the energy modeling of an office building and the Baseline is using a System 7, climatic zone is 4a.
Plumbing & electrical out buildings and Space Usage table
NC-2009 PIf3:Occupant and Usage Dataposted by Erin Holdenried on
I have a building that has multiple separate enclosed buildings for electrical, fire tanks, and water tanks.
MPR6
Retail-NC-v2009 EAc5:Measurement and verificationposted by Ward Miller on
Has anyone tried earning 1 point for MPR 6 on this credit as is available in other rating systems?
Building Density Clarification
CS-2009 SSc2:Development Density and Community Connectivityposted by James Wieben on
The sample calculations in the Tool Kit example all have a building on the property. My real life example has some areas with surface parking and no building.
Defining 'one building'
NC-2009 PIf1:Minimum Program Requirementsposted by Erin Holdenried on
I have a project with two adjacent buildings that are basically physically distinct structures with a short enclosed corridor that connects the two. Can this project be considered one building?
Active ingredient
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Katherine Ann Resurreccion on
Hi All, Our client uses pesticides/chemicals in their facility, some are those that are commercially available or sold for household use, however the active ingredient is not present on the SF haz
WEc1 Option 2 Path 1
NC-2009 WEc1:Water Efficient Landscapingposted by Don Hardwick on
Hi, I have a project planning to use 100% non- potable water for irrigation.They are planning on doing this through collecting rain water.
UnmetLoadHours - Do we have clarity yet?
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
The definition of Unmet Load Hours has been vague for quite some time. ASHRAE 90.1 2010 was supposed to address this issue. Do we have some resolution about this yet?
Option 1 - is a residential element required?
CI-2009 SSc2:Development Density and Community Connectivityposted by R Jones on
If a project is pursuing option 1 development density calculations must there be a residential element recorded within the 60,000sf/acre figure? thank you