Forum quick links
converting VOC content
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Adi Negara, LEED AP BD+C on
Hi I receive several MSDS for the coatings that will be used in our project and inside them, the VOC content is measured in Europe (EU) which are usually expressed in percentage % (w/w).
About the 1/4 mile distance
CS-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Guillermo Hernandez Espinoza on
Our project has access to 2 bus stops, 1 located just outside of the building's perimeter with 2 bus lines and the other one is the main one, whit main it means that's the one the 90% of the people
CI for a residential home
posted by Emmanuel Pauwels on
We are evaluating an international (non-US) project that would like to build 2 separate buildings on one single site.
I'm working on finalizing
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Heather Anderson on
I'm working on finalizing documentation for a LEED project. We have completed the calculations and are only looking about 15% savings.
Aggregating data
CS-2009 MRc4:Recycled Contentposted by Eeshoo Rehani on
One LEED site boundary has two individual LEED projects that are under construction under one contract by the same GC.
If you are registered for
posted by Francis Chua on
If you are registered for LEED v2.2, then you must follow AGMBC, 2005. As you mentioned, all 4 buildings must independently meet the requirements for the EQ credits.
WEc1
CI-2009 WEc1:Water Use Reductionposted by Linda Delair on
As 1.6 is a standard low flow toilet, in order to further reduce water use is it better to specify a 1.28 gpf or a dual flush toilet? Thank you.
Pilot Credit 9
Pilot-Credits PC9:Street Networkposted by Jeffrey Lewis on
I'm not sure why this point is necessary, to be completely honest.
LEED CS v2009 certified building
CI-2009 IEQp1:Minimum IAQ Performanceposted by Aaron Yorke on
Hi all, We have a small LEED:CI project in a CS certified shopping mall. We don't have any direct outdoor air intakes, we take the air from the main atrium and give it to our space.
In a LEED certified building
CI-2009 SSc2:Development Density and Community Connectivityposted by Aaron Yorke on
Hi all, We have a CI project in a CS v2009 certified project which achieved the development density points.