Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Table 1.4.7B - Proposed Air-Side HVAC System Schedule - Outdoor Airflow cfm

NC-2009 EAp2:Minimum Energy Performance
posted by  Maria Spastri  on 

Hi,

I need a couple of clarificaitons regarding the Outdoor Airflow that has to be listed in Table 1.4.7.B of the proposed systems. The project is located in California.

3
Default Avatar
Sustainability Consultant
AECOM
LEEDuser Basic Member
0 thumbs up
Wed Oct 25, 2017, 7:58 pm

VOC Range in Low-Emitting Calculator

NC-v4 EQc2:Low emitting materials
posted by  Agnieszka Rylska  on 

We received the documentation confirming that material which will be applied on site (steel elements in these specific case) has emission of VOC compliant with ISO 16000-9 following French legislat

3
Wed Oct 25, 2017, 11:01 am

5% of the total site

CS-2009 WEc1:Water Efficient Landscaping
posted by  Carla Lopez  on 

Hello, We have a project that has a vertical garden on the exterior walls. Can we count this towards the 5% we need to comply? I tried to find answers, but no luck yet! Thanks!

3
Wed Oct 25, 2017, 10:38 am

Preferred parking FE vehicles and VIP parking

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Maria Isabel Conde  on 

Hello, Our Office HQ project has 4 underground carpark levels. The client wants to have the 1st underground floor reserved for VIP parking.

5
Default Avatar
Sustainable Building Advisor
Perkins + Will
LEEDuser Basic Member
4 thumbs up
Tue Oct 24, 2017, 4:51 pm

LEEDv4-NC "Detailed" Checklist: does this exist?

LEED Rating System Selection
posted by  Erica Downs  on 

Posting here because I'm not sure where else to... 

3
LEED for Homes Techincal Development
US Green Building Council
LEEDuser Expert
38 thumbs up
Tue Oct 24, 2017, 4:02 pm
3
Default Avatar
SmithGroupJJR
LEEDuser Premium Member
0 thumbs up
Tue Oct 24, 2017, 2:49 pm

Managing rainwater in clay soil with low permeability

CS-v4 SSc4:Rainwater management
posted by  Maria Glädt  on 

Hi, Our project site is a landfill area which was used as a parking during the construction of a tunnel located nearby. The site consists on very low permeable soil (mainly clay).

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Tue Oct 24, 2017, 2:12 pm