Metering make-up water for geothermal system
NC-v4 WEc4:Water meteringposted by Daniel Davis on
We are installing a meter onto the geothermal well water makeup water (due to evaporation/leakage) – will this count as the additional meter, under process water?
Remediation done by previous owner as part of purchase agreement
NC-2009 SSc3:Brownfield Redevelopmentposted by on
If the building owner purchased the building with the remediation done as part of the purchase agreement by the prior owner can they still receive this credit?
Join Your Peers at the Summer Pre-Summit Workshop!!
posted by RoseAnn Grimes on
Hello everyone!
Demand Control Ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Ricardo Sá on
Dear All,
Natural Land Cover conditions, option 2
NC-v4 SSc4:Rainwater managementposted by Ricardo Sá on
Dear All,
I have some questions regarding SS C4 Rainwater Management: Natural Land Cover conditions, option 2.
balconies and heat island reduction
CS-v4 SSc5:Heat island reductionposted by Sareet Benayahu on
hello, our project has a large balcony on the second floor of the building.
Option 2: Provide Backup Power for critical loads (1 point) - Back-Up Power Time Duration Table 1.
Pilot-Credits IPpc100:Passive Survivability and Back-up Power During Disruptionsposted by Dionisio Franca on
Back-up power time duration table 1 divides facilities in three categories:
SCL Whole Group Web Meeting - Construction Waste
posted by RoseAnn Grimes on
You're invited to join your colleagues in an SCL Whole Group Web Meeting on Construction Waste May 14th, 2019 11am - Noon EST!!
Certified Emissions Reduction Offsets
posted by Mary Ann Lazarus on
Hi: Is anyone individually or at a firm level offsetting their travel through Certified Emissions Reduction (CER) or Verified Emissions Reduction (VER) credits?