Forum quick links
2 Bedroom Dormitory
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jason Chauvin on
I am currently designing a new university dormitory that includes rooms with 2 bedrooms and 2 desks in each room. In other words, each room houses 2 students.
MR4 & MR5 Credits LEED 2009 NC
NC-2009 MRc4:Recycled Contentposted by Brian Harris on
We are working on a project where the entire site needs 50'-0" deep compaction grouting at 6'-0" o.c to stabilize it.Then this public project will be pile supported.
Office occupancy - LEED CS 2009
posted by Elodie DUMAS on
Dear All, a question for a core and shell project. The LEED reference guide Appendix 1 states : “Core and shell projects that do not have the final occupancy counts must utilize the default occup
Residential Building
posted by K A on
Hello, A residential apartment building four stories high, all rented apartments to tenants and in construction since last year and due for occupancy this summer.
Problems with tracking spreadsheet
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Chris Miller on
I'm having problems with the Tracking Sheet in the Documentation Toolkit. The drop-down menus are empty.
too much light?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by kate dixon on
I calculated the floor area in rooms that had less than .15 that would contribute. however, many spaces have over .18 (too much light).
Basecase system selection for Hotel Building in a mixed use dev
CS-2009 EAc1:Optimize Energy Performanceposted by Kevin Sullivan on
We have a high rise mixed use development in Bangalore, India for which we are following Appendix G methodology for LEED Energy compliance.
Active control modulating the HVAC system as per space demand
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Lavanya Veerappa on
Does that mean a dedicated VAV box hooked with any one of the following meets the requirement: 1. Thermostat control 2. Occupancy sensor 3.