Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
10
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Feb 20, 2013, 8:57 pm

2 Bedroom Dormitory

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Jason Chauvin  on 

I am currently designing a new university dormitory that includes rooms with 2 bedrooms and 2 desks in each room. In other words, each room houses 2 students.

7
Tue Feb 19, 2013, 9:21 pm
6
Tue Feb 19, 2013, 9:14 pm

MR4 & MR5 Credits LEED 2009 NC

NC-2009 MRc4:Recycled Content
posted by  Brian Harris  on 

We are working on a project where the entire site needs 50'-0" deep compaction grouting at 6'-0" o.c to stabilize it.Then this public project will be pile supported.

8
Default Avatar
LEEDuser Expert
472 thumbs up
Tue Feb 19, 2013, 8:56 pm

Office occupancy - LEED CS 2009

Calculating FTEs
posted by  Elodie DUMAS  on 

Dear All, a question for a core and shell project. The LEED reference guide Appendix 1 states : “Core and shell projects that do not have the final occupancy counts must utilize the default occup

2
Default Avatar
ALTO Ingénierie
LEEDuser Basic Member
15 thumbs up
Tue Feb 19, 2013, 5:54 pm

Residential Building

LEED Rating System Selection
posted by  K A  on 

Hello, A residential apartment building four stories high, all rented apartments to tenants and in construction since last year and due for occupancy this summer.

6
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Feb 19, 2013, 5:48 pm

Problems with tracking spreadsheet

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Chris Miller  on 

I'm having problems with the Tracking Sheet in the Documentation Toolkit. The drop-down menus are empty.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Feb 18, 2013, 6:56 pm

too much light?

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  kate dixon  on 

I calculated the floor area in rooms that had less than .15 that would contribute. however, many spaces have over .18 (too much light).

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Mon Feb 18, 2013, 5:18 pm

Basecase system selection for Hotel Building in a mixed use dev

CS-2009 EAc1:Optimize Energy Performance
posted by  Kevin Sullivan  on 

We have a high rise mixed use development in Bangalore, India for which we are following Appendix G methodology for LEED Energy compliance.

3
Default Avatar
Energy Analyst
The Wall Consulting Group
LEEDuser Basic Member
1 thumbs up
Mon Feb 18, 2013, 4:02 pm

Active control modulating the HVAC system as per space demand

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Lavanya Veerappa  on 

Does that mean a dedicated VAV box hooked with any one of the following meets the requirement: 1. Thermostat control 2. Occupancy sensor 3.

3
Ms
LEAD Consultancy & Engineering services
LEEDuser Basic Member
5 thumbs up
Mon Feb 18, 2013, 2:42 pm