Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED NC energy model for spaces occupied by other tenants

NC-2009 EAc1:Optimize Energy Performance
posted by  Cory Ferguson  on 

We are designing a 4 story building where the owner will occupy 3-1/2 floors of the building and another tenant will at some point occupy the remaining portion.

2
Default Avatar
President
Weatherby Design & Co. Engineers
LEEDuser Basic Member
67 thumbs up
Fri Nov 8, 2013, 9:03 pm

Timing of surveys

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  American University  on 

We are dealing with the challenge of surveying commuters on a college campus.

3
Founding Parnter
eco evolutions
LEEDuser Basic Member
3 thumbs up
Fri Nov 8, 2013, 7:28 pm

Indirectly Conditioned Bathrooms

NC-2009 EAc1:Optimize Energy Performance
posted by  Phillip Cook  on 

I am using IES VE to model hotel type rooms that each have a separate bathroom. The bathrooms do not have any heating equipment, cooling equipment or thermostats in them.

9
Fri Nov 8, 2013, 5:51 pm

Circulation space Ventilation

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Mike D  on 

Review comments have asked us to include circulation space in our VRP calculator. However, the corridors in the building will not be served by direct air supply.

4
Default Avatar
LEED AP
ABUD Engineering Ltd.
LEEDuser Basic Member
34 thumbs up
Fri Nov 8, 2013, 4:44 pm

Statement Of Energy Performance valid for France ?

EBOM-2009 EAc6:Emissions Reduction Reporting
posted by  florian Beauchet  on 

Hi, I'm a french engineer and I'm wondering if the SEP considers the region of the study. Indeed my site is in France, thus does the GHG emissions result use french emission factor ? Same questi

2
Fri Nov 8, 2013, 7:31 am

Flush Out using exhaust fans / natural ventilation

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Maya Karkour  on 

Dear All, Our project is aiming for the Flush-out option of this credit. 1) For the car parking (on the Ground Level), the air is exhausted by dedicated exhaust fans as per ASHRAE 62.1.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Thu Nov 7, 2013, 9:33 pm

Tenant Sales or Lease Agreement

General forums
posted by  Julie Hendricks  on 

I have several clients that are nearly refusing to provide a copy of their lease agreements because of concerns over confidentiality.

3
President
Sage Building Revival
LEEDuser Premium Member
113 thumbs up
Thu Nov 7, 2013, 9:30 pm

VAV terminal unit modulation

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Jorge Torres-Coto  on 

I have a Tenant Improvement that has VAV terminal units connected to an existing VAV AHU. The contractor and owner decided to save money and utilize stand alone control.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Thu Nov 7, 2013, 6:56 pm

Industrial Park / Campus Program

ND-v2009 PIf1:Development Program and Site Type
posted by  Rodrigo Gomez Junco  on 

We have a client who is planning on building an industrial park. Initially our idea was to approach the certification through the Campus Program.

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Thu Nov 7, 2013, 6:23 pm

Non-toxic Rodent Bait

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Jerad Furze  on 

I am working on a project in Canada where the Pest Management vendor uses a product called "Detex Blox".

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Thu Nov 7, 2013, 3:51 pm