Forum quick links
LT, VLT & Tvis
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Biagio Arevalo on
I´m planning to approach this credit through the prescriptive path but I´ve been having some difficulties finding the Tvis for the glass.
Occupant "Eco-involvement"
CS-2009 IDc1:Innovation in Designposted by Julien Daclin on
On a french project, the future occupants will be involved in the best practice functionning of the building. When external conditions are satisfying (temperature and wind) LCD screens placed in th
Limiting access once the building is enclosed
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Vanessa Seibert on
Our experience on projects is that limiting the access to one door with a long, regularly cleaned carpet, is expected by the LEED reviewer.
Exhausted heat
NC-2009 EAc1:Optimize Energy Performanceposted by Kath Williams on
Can a LEED project use exhausted/waste heat (and claim credit of some kind) from an adjacent building that is not being included in LEED project boundary?
Systems Furniture Panel Fabric
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Lori Selcer on
We have specified panel sysems for our project which are Greenguard certified. However we are using COM fabric for the panels, that is, we are using fabric from another manufacturer.
Savings calculations
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Sundararaj Subburaman on
Our client is occupying the 8th floor of a G+8 building. The central plant is a combination of Air cooled and water cooled chillers.
Completing the LEED Template for WEp1
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by R Jones on
We are needing to go down the route of Case 4 where there are facilties in landlors and tenant areas but we can only pursue the WEp1 which is fine.