Parking under building - still need SRI ?

EBOM-2009 SSc7.1:Heat Island Reduction—Nonroof
posted by  Jaida Anderson-Lozano  on 

My project is currently assessing which credits for EBOMv2009 can be achievable by reviewing the LEEDonline forms. For credit SSc7.1 the project will achieve compliance via Option 2.

2
Sustainability Coordinator
Webcor Builders
LEEDuser Basic Member
40 thumbs up
Fri Aug 2, 2013, 6:45 pm

Average energy cost savings

NC-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

Does anybody know what is the average of energy cost savings reported to LEED/USGBC? We are just wondering to compare all projects overall. Thanks

3
CEO
ECON Group
LEEDuser Basic Member
126 thumbs up
Fri Aug 2, 2013, 3:58 pm

Type and Number of Boilers

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

In the building that I’m modelling there are two floors. On the ground floor the conditioned area is 3393m^2 and on the first floor it is 2689m^2.

3
Fri Aug 2, 2013, 3:52 pm

Exit Signs

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Elena Grau  on 

Hi, I'd like to know which kind of luminaire means "exit signs". Does it means the constant light of the emergency lights? Thanks,

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Fri Aug 2, 2013, 11:19 am

Warehouse - Windows as part of roll up dock doors

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Charline SEYTIER  on 

We are working on a project that has a loading deck with an area inside at the perimeter of the warehouse that will be regularly occupied.

3
CEO, Co-owner.
ThemaVerde, France
LEEDuser Basic Member
15 thumbs up
Thu Aug 1, 2013, 2:48 pm

Paints off-site

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Mike D  on 

Are there any requirements on paints that are applied off-site on materials that are brought to site afterwards?

2
Thu Aug 1, 2013, 1:48 pm

FTE?

EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Survey
posted by  John Kinch  on 

Hi there, I just wanted to confirm that for this particular credit we don't need to use FTE? We have a small staff here - 18 total staff members, only 6 of whom are full-time.

6
Default Avatar
ecoPreserve: Building Sustainability
LEEDuser Basic Member
101 thumbs up
Thu Aug 1, 2013, 1:16 pm

100% Recycled Fiber

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Elizabeth Felder  on 

Our building purchases generic toilet tissue and paper towels that state "100% recycled paper product" and "100% recycled fiber" on the box.

7
Thu Aug 1, 2013, 12:53 am

Credit Requirements

Pilot-Credits MRpc61:Material disclosure and assessment
posted by  Catherine Blakemore  on 

What exactly are the credit requirements? I read through the reference Pilot Credit 43 and also what I could find ON CEN (EN) standard 15804.

7
Wed Jul 31, 2013, 6:42 pm

LEED CI for Retail WEp1

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Blythe Jopling  on 

Our store is located in a shopping mall where customers have no access to WCs in the shop, but use the WCs provided within the main shopping mall.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jul 31, 2013, 4:48 pm