Forum quick links
Parking under building - still need SRI ?
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Jaida Anderson-Lozano on
My project is currently assessing which credits for EBOMv2009 can be achievable by reviewing the LEEDonline forms. For credit SSc7.1 the project will achieve compliance via Option 2.
Average energy cost savings
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
Does anybody know what is the average of energy cost savings reported to LEED/USGBC? We are just wondering to compare all projects overall. Thanks
Type and Number of Boilers
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
In the building that I’m modelling there are two floors. On the ground floor the conditioned area is 3393m^2 and on the first floor it is 2689m^2.
Exit Signs
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Elena Grau on
Hi, I'd like to know which kind of luminaire means "exit signs". Does it means the constant light of the emergency lights? Thanks,
Warehouse - Windows as part of roll up dock doors
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Charline SEYTIER on
We are working on a project that has a loading deck with an area inside at the perimeter of the warehouse that will be regularly occupied.
Paints off-site
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Mike D on
Are there any requirements on paints that are applied off-site on materials that are brought to site afterwards?
FTE?
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by John Kinch on
Hi there, I just wanted to confirm that for this particular credit we don't need to use FTE? We have a small staff here - 18 total staff members, only 6 of whom are full-time.
100% Recycled Fiber
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Elizabeth Felder on
Our building purchases generic toilet tissue and paper towels that state "100% recycled paper product" and "100% recycled fiber" on the box.
Credit Requirements
Pilot-Credits MRpc61:Material disclosure and assessmentposted by Catherine Blakemore on
What exactly are the credit requirements? I read through the reference Pilot Credit 43 and also what I could find ON CEN (EN) standard 15804.
LEED CI for Retail WEp1
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Blythe Jopling on
Our store is located in a shopping mall where customers have no access to WCs in the shop, but use the WCs provided within the main shopping mall.