NC-2009 IEQp1:Minimum indoor air quality performanceposted by Mike W. on
In New York the local code does not follow IBC or ASHRAE 62.1. It requires 20cfm/person and 0cfm/sf.
LEED V4
posted by ola shunnar on
I am wondering about LEED v4, when its come up? and could I register the project under V3 even there is a V4??
MERV 13 filters
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Paula Hernandez on
The Guide asks for MERV 13 filters for all return and outside air ...does it mean, for instance in a VRF air conditioning system or in a fan coil system, that each evaporator or each fan coil shoul
SSc2 Option 1
CI-2009 SSc2:Development density and community connectivityposted by Andrea Daniels on
Where do you find the each site's area/acres and building's square feet within the project's density radius?
PC 9
Pilot-Credits PC9:Street Networkposted by Nate Steeber on
I really like this credit, and I think it shows a value to choosing a home locations that was otherwise unnoticed. I do, however, have some questions about intersections, and some options that may
SSc2 Option 1 Development Desity
CI-2009 SSc2:Development density and community connectivityposted by Andrea Daniels on
Do all the buildings within the Density Radius have to be part of the calculation?
FTE
CS-2009 EAp2:Minimum energy performanceposted by Adam Targowski on
When can we use actual occupancy counts in energy modeling? Is it necessary to have a tenant lease to use the actual occupancy counts?
Plywood sheathing
Schools-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Franklin Snyder on
I am having a very difficult time locating plywood sheathing that has been tested per the requirements of the California Department of Health Services Standard Practice for the Testing of Volatile
Main Entry facing a Plaza
Pilot-Credits PC14:Walkable Streetsposted by Roshini Das on
Our project is a dormitory for 1-8 grade kids located in a campus.
OnSIte Renewable Energy Limitations
EBOM-2009 EAc4:On-site and off-site renewable energyposted by Janna Nash on
My EBOM project office building is interested in particiapating in the local power company's "Green Power Provider" program.