Forum quick links
Comfort Survey
posted by Jennifer Knocha on
We have been asked if it is possible to conduct an additional comfort survey and submit the results, even though we have already completed the initial submission and gotten our first set of review
Question
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Redy Truccolo on
Hi Everybody, I'm doing a CS 2009 Pre Certification and I've already achieved the 50% reduction for the WEc2 Innovative Wastewater technologies. My question is, if I apply for this Pilot Credit (w
Double skin facade model
NC-2009 EAp2:Minimum Energy Performanceposted by Florent Fabre on
Hi all, I’m working on a LEED certification on an office building with a double skin facade.
Required Number of Trips
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Caroline O'Leary on
I've been attempting to discover the number of times, or if there is a minimum number, that a bus must serve the stop in a day to count for this credit.
LEED Interpretation Rulings-When can they be followed?
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Judy Landwehr on
Which of the below statements applies to a LEED Interpretation Ruling. The below statements appear to conflict with each other.
Comprehensive Transportation Management Plans
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Eric Shamp on
In the LEED 2009 BD&C Reference Guide, there is language in each of the SSc4 credits sections that indicates that a Comprehensive Transportation Management Plan (CTMP) can earn the project one
LEV/FEV parking space allotment in a campus setting
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Laura Charlier on
We are involved with a project that consists of two new student housing facilities on a college campus.
Alternative for ESC plan in hot climate zones (Outside the US)
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Eyad Haj Husein on
We're applying for LEED for New Construction in Doha, Qatar. The question is: where can I find information about the alternative of ESC plan?
Rated Power for an Ice Machine
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by William Weaver on
We have a number of ice machines on our project that are Energy Star certified.
Energy Star Equipment Eligibility
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Michelle Rosenberger on
As we all know, our Energy Star requirement is based on the eligibility of the equipment for rating and that eligibility is defined by Energy Star not by the USGBC.