Forum quick links
Operable Windows
CS-2009 IEQp1:Minimum IAQ Performanceposted by Luis Miguel Diazgranados on
We are working on a natural ventilated CS office building. The Leedonline form asks to fill in a table with the operable window area, in order to calculate ratio of window to occupiable area.
Baseline and design system selection
NC-2009 EAp2:Minimum Energy Performanceposted by Bala Srini on
Our semi industrial building's production area does not have cooling system, Proposed model simulated based on ASHRAE 90.1-2007, Table G3.1, 10. HVAC No.
No Smoking Signage at Retail Entrances
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Jessica Hawley on
I have a building with several ground-floor retail spaces.
Table SSc7.1-2 not populating
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by sara frye on
I have posed this question to LEED help but they have still not gotten back to me and I am getting impatient.
Counting of on-site / off-site parking
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Erin Holdenried on
We have a non-residential new construction campus project where the local authority has recommended 1028 spaces (no minimum or maximum).
Hand Dryers- Are they Considered Durable Goods?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Geoffrey Tomlinson on
We are purchasing hand dryers to eliminate paper waste, but since there are no EnergyStar rated hand dryers, would this count against us for our durable goods purchasing the performance period?
keeping LEED records
posted by Tristan Roberts on
Reynaldo, can you clarify what you have in mind? What records are you keeping, and for what purpose?
phased construction and LEED certification
posted by Tristan Roberts on
Thomas, it sounds to me like certifying the completed project (after Phase III) makes the most sense. Interrupting the flow of things seems like it adds more hassle.
Building Move and Reuse
Schools-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Eric Carbonnier on
Would this be the appropriate credit to pursue the move and reuse of a structure?
ID Credit for Renewable Energy
NC-2009 IDc1:Innovation in Designposted by Dave Wortman on
We are interested in pursuing an ID credit for our new building's onsite renewable energy, namely our PV system.