Forum quick links
water cooled chilller
NC-2009 EAp2:Minimum Energy Performanceposted by sherif el adly on
Hi Marcus The building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller + ice sto
green power source
NC-2009 EAc6:Green powerposted by sherif el adly on
The client have a solar park in a land adjacent to the land on which the project will be built.
Substantial Completion, C of O, TCO
posted by Erika Duran on
Per the LEED certification Policy – we can submit construction review at Substantial Completion (defined as the date on which the building receives a Certificate of Occupancy or similar official in
Use of Hycrete waterproofing admixture for Innovation credit
NC-2009 IDc1:Innovation in Designposted by Donna Juselis on
Our project is a mixed use redevelopment in a flood prone area. The first floor slab-on-grade on the project is located below the design flood elevation.
Process temperature controlled space
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Karen Elliott on
Hi I have a project where the temperature must be controlled automatically to ensure the manufactured product quality is maintained.
Non Local Supplier
CS-2009 MRc6:Certified Woodposted by Jose Antonio Kovacevic on
Hi, We have a non local supplier.
Modeling system serving both HVAC and Process
NC-v4 EAc2:Optimize energy performanceposted by Visu Boj on
We are doing certification for a beverage factory. The factory requires chilled water for process load that is served by 2*1080 kW Evaporatively cooled Screw chillers.
Lighting control for Meeting room
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Thanh Le on
If a meeting room is designed with occupany sensor and manual override, does it comply with this credit. If it does not comply, how do we do to comply with this credit.
Reference for the Total Daily Uses numbers
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Neshat Sakeena on
Hello, I was just wondering if anyone knows the reference or basis of the numbers used in Table 2. Default Fixture Uses, by Occupancy Type in the LEED manual?
Code is surpassing 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by Amrit Kaur on
In a Jurisdiction where code is surpassing ASHRAE 90.1-2010 LEED buildings are required (by code) to meet the more stringent requirements but measure their energy score based improvement from ASHRA