NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  April Ambrose  on 

A spec-built, cold-dark shell of a building was built with 4 walls and a roof, but the floor is still dirt.

1
Tue Jan 17, 2017, 11:55 pm

EBOM 2009 IEQ3.2 Alternative Compliance Path

EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessment
posted by  Kimberly Hosken  on 

Our project is a five story public building with operational contracts which include "contract document requirements".

1
Sun Jan 15, 2017, 3:32 pm

Integrity of information under Development Density Option

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Eric Bautista  on 

Hello Fellow LEEDUsers, I am about to submit LEED docs for preliminary review. I just want to ask if we are using Option 1 Development Density, how can we prove the integrity and accuracy of nume

1
Fri Aug 12, 2016, 5:31 pm

Replace All Filtration Media

EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additions
posted by  Ran Zhang  on 

Hi I am working on a project located in Tokyo Japan. We are aiming to pursue IEQ c1.5 and thinking about the requirements regarding the filtration media replacement right now.

1
Tue Jun 14, 2016, 7:02 pm

Staggered Vegetated Areas

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Martin Meehan  on 

Hello, Our project contains vegetated areas which are located in staggered locations within the LEED boundary.

1
Thu Jan 19, 2017, 2:06 pm

40% WWR does it include the wall connected to other building?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

90.1 only says above grade wall, but if we have a wall that's directed connected to another building, should we also include those wall area in the calculation?

0

40% WWR does it include the wall connected to other building?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

I wonder if the wall is directly connected to adjacent building ,should we include them in the window to wall calculation?

1
Tue Jun 14, 2016, 2:01 pm

Process Water Reduction

Schools-2009 WEc2:Innovative Wastewater Technologies
posted by  Charles Shinneman  on 

Can this credit be used for process water reduction? Washing machines for example.

1
Sun Aug 27, 2017, 12:13 am

Enhanced Cx -CxA in an Integrated Project Delivery IFOA format?

CI-2009 EAc2:Enhanced Commissioning
posted by  Margaret Montgomery  on 

In a contractual situation where the contractor, owner and architect are bound in a single contract, who is able to hire the CxA for enhanced commissioning?

1
Tue Jun 14, 2016, 9:49 pm

O+M: Retail or ID+C: CI

LEED Rating System Selection
posted by  Yulia Chen  on 

Hi, We are a tenant occupying 30% of a multi-tenant building. The office was last renovated in 2011.