NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by April Ambrose on
A spec-built, cold-dark shell of a building was built with 4 walls and a roof, but the floor is still dirt.
EBOM 2009 IEQ3.2 Alternative Compliance Path
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Kimberly Hosken on
Our project is a five story public building with operational contracts which include "contract document requirements".
Integrity of information under Development Density Option
NC-2009 SSc2:Development Density and Community Connectivityposted by Eric Bautista on
Hello Fellow LEEDUsers, I am about to submit LEED docs for preliminary review. I just want to ask if we are using Option 1 Development Density, how can we prove the integrity and accuracy of nume
Replace All Filtration Media
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Ran Zhang on
Hi I am working on a project located in Tokyo Japan. We are aiming to pursue IEQ c1.5 and thinking about the requirements regarding the filtration media replacement right now.
Staggered Vegetated Areas
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Martin Meehan on
Hello, Our project contains vegetated areas which are located in staggered locations within the LEED boundary.
40% WWR does it include the wall connected to other building?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
90.1 only says above grade wall, but if we have a wall that's directed connected to another building, should we also include those wall area in the calculation?
40% WWR does it include the wall connected to other building?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I wonder if the wall is directly connected to adjacent building ,should we include them in the window to wall calculation?
Process Water Reduction
Schools-2009 WEc2:Innovative Wastewater Technologiesposted by Charles Shinneman on
Can this credit be used for process water reduction? Washing machines for example.
Enhanced Cx -CxA in an Integrated Project Delivery IFOA format?
CI-2009 EAc2:Enhanced Commissioningposted by Margaret Montgomery on
In a contractual situation where the contractor, owner and architect are bound in a single contract, who is able to hire the CxA for enhanced commissioning?
O+M: Retail or ID+C: CI
posted by Yulia Chen on
Hi, We are a tenant occupying 30% of a multi-tenant building. The office was last renovated in 2011.