1-floor renovation in an 2009 EBOM Certified Building

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  John Krutko  on 

I am proposing on a project in which the scope is the renovation of a single floor of a 10 story building that is currently LEED 2009 EBOM certified.

1
Wed Apr 12, 2017, 8:28 pm

Energy Modelling - Australia

NC-v4 EAp2:Minimum energy performance
posted by  Quentin Jackson  on 

We have a Green Building Council in Australia that has a very advanced energy simulation methodology that achieves the same outcomes as the ASHRAE 90.1 process outlined in LEED.

1
Thu Apr 13, 2017, 2:56 pm

>10% exemption possible?

EBOM-2009 MPR2:Must be a complete, permanent building or space
posted by  Rasita Masalskyte  on 

Hello, Has anyone heard of possibility to exclude >10% of building gross area that is under separate ownership and management? In our case such space makes 14%.

0

Project size extended in the middle of construction

NC-v4 MPR3:Must comply with project size requirements
posted by  wachira sosaeng  on 

My project registered for LEED 2009, mixed use building with 2 towers on the same podium.

1
Tue May 30, 2017, 5:12 pm

Process Water

Retail-NC-v2009 WEp1:Water use reduction
posted by  Donald Green  on 

We have a project where there are a couple pieces of equipment that may be considered Process Water: a mobile pressure washer and a parts washer.

0

Project size extended in the middle of construction

NC-2009 MPR4:Must comply with minimum floor area requirements
posted by  wachira sosaeng  on 

My project registered for LEED 2009, mixed use building with 2 towers on the same podium.

1
Sat Aug 26, 2017, 9:03 pm

Demolished and rebuilt envelope

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

If the envelope is demolished and then rebuilt with the same shape does Table G3.1 part 5., baseline, point f apply?

1
Mon Apr 17, 2017, 2:25 pm

Baseline System 2

NC-2009 EAc1:Optimize Energy Performance
posted by  SSN Energy Model  on 

As per Table 6.8.1D, I observed the following EER = 12.3-(0.213*Cap/1000) EER Also, Cap means the rated cooling capacity of the product in Btu/hr.

1
Fri Apr 21, 2017, 2:48 pm

Calibration

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Gustavo De las Heras Izquierdo  on 

Hallo, According to the BMS and HVAC subcontractor, the sensors do not need to be calibrated, particularly CO sensors and chilled water temperature sensors.

1
Tue Aug 29, 2017, 3:45 pm

Resources Links not working

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  RYAN BEN SABILALA  on 

I noticed some of the links for the Resources Page are not working anymore. Can anyone do an update? Thank you.

0