Forum quick links
Secure Long-Term Storage - "Within" 100'-0" Feet
CI-v4 LTc4:Bicycle facilitiesposted by Kristina Bach on
Our project is looking at providing an enclosed long-term bicycle storage area which is only accessible by key-card to FTE's who have signed the bicycle access agreement.
Temporary Irrigation with v6 Form
NC-2009 WEc1:Water Efficient Landscapingposted by Michelle Rosenberger on
Even if pursuing Option 2 Temporary Irrigation, we've always had to comply with Option 1 reductions also. The points were additive.
HIT-HY 200-R
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Celimar Fournier on
We are currently using the above mentioned product in our project. Under what product type should I report this product?
municipality irrigation line
CS-v4 WEc1:Outdoor water use reductionposted by Radwa Amin on
the district that the project is located in has a municipality water line dedicated to irrigation and it is not potable water (recycled). Does that count as an alternative water sources? Thank you
LEED ND Infrastructure energy efficiency
ND-v4 GIBc13:Infrastructure energy efficiencyposted by Lakshmi Suryan on
Hi , I am looking at specific methodologies regarding setting up the baseline energy use for infrastructure for a master plan .
Can we use the IEQc4.5 Furniture and Furnishings as an ID credit
NC-2009 IDc1:Innovation in Designposted by Carmen Vidal-Hallett on
Hello: Our team is completing the maximum amount of credits under the IEQc4 and we were wondering if the IEQc4.5 Furniture and Furnishings can be counted as an Innovation and Design credit.
Lots and open space question
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Albert Sagrera on
Hello, We are wondering if a future building occupying two different plots can be considered as a single LEED project or not. In the case that it is considered as a single project, as it affects
Views exculsion for High Bay Window areas
Schools-2009 IEQc8.2:Daylight and Views—Viewsposted by David Sundersingh on
We are in the early stages of design for a Career Compact Center, this has 3 workshop areas with high bay windows for natural lighting.
Multi-use project
Mid-Rise-v4 MPR2:Must use reasonable LEED boundariesposted by Vanessa Toralti on
We have a new LEED v4 Multifamily Midrise project (Homes), it’s several residential buildings on the same site.
Combined Purchasing
EBOM-2009 MRp1:Sustainable Purchasing Policyposted by Ryan Hoffman on
The project in question is the north building of a 2-building, 1 million sf facility.