Forum quick links
Buildings w/ programmatic dependency/architectural cohesiveness
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Ricardo Sá on
I have a client that is developing an open-air type shopping center (i.e., the tenant stores are arranged in blocks that open to exterior interconnecting walkways) and is willing to pursue LEED cer
Indoor Water Use Reduction_Well water
CS-v4 WEc2:Indoor water use reductionposted by Giuseppina Amorusi on
Hi everybody, I was envolved in LEED v4 C&S certification. I would know if in Credit Indoor Water Use Reduction it’s possible to consider well water accumulated in water tank as alternative wat
Area clarification
CS-2009 EAp2:Minimum Energy Performanceposted by Magda Aghababyan on
Hi, We have Core & Shell project while calculating the area of the locations, Pif and EAp2 have difference approximately 4% please let us know what is the maximum percentage deviation. Thank y
precertification vs certification differences in regularly area
posted by Catharina B on
Hi All My project is after precertification, there all Pif's are approved. Now during the construction the quontity of regularly area has been changed.
Lighting power density in tenants
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
According to LEEDv4 reference guide, tenants' lighting system must be modeled identically in the proposed building and in the baseline, as specified by Appendix G (unless energy savings are being c
Storm water calculation
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Magda Aghababyan on
Hi, We are working in project previously land was empty top soil is hard and when calculating Pre-development
Open mall shopping centre baseline model
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
I'm currently working in a project of a shopping centre (common areas + tenant areas) pursuing LEED certification (Core&Shell).
Diverse uses located within LEED project boundary
NC-v4 LTc6:Bicycle facilitiesposted by Ricardo Sá on
I'm working on a shopping center development that will include at time of occupancy more than 10 diverse uses within project boundary.
Amount of rainwater treated with a storage tank
NC-v4 SSc4:Rainwater managementposted by Ricardo Sá on
Hi all, I'm working on a project that is pursuing LEED certification.
self-levelling compound
Retail-NC-v2009 IEQc4:Low-emitting materialsposted by stefano pieretti on
Does anyone know which categories of low emitting materials is the self-leveling compound ?