Forum quick links
IAQ management plan-during construction or before occupancy
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Kali Wolin on
I am wondering if you can obtain the credit for Construction IAQ management plan DURING CONSTRUCTION along with BEFORE OCCUPANCY or if it is just one credit or the other.
LEED Pilot Credit 30
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by S. Sachs on
We are pursuing v2009 certification on an office building for this credit using Pilot Credit 30 for bicycle routes (alternative compliance path); however, since this project started the pilot credi
V4 EBOM - Commissioning
EBOM-v4 EAc2:Existing building commissioning - implementationposted by Meier Corporate Account on
Good Afternoon, Our manufacturing plant was constructed in 2014-2015 and went online in August of 2015.
What are the baseline conditions?
EBOM-v4 SSc5:Site managementposted by Zachary Hayes on
This says we have to reduce from the baseline, which I assume is our initial reported use. However, if this is the case how can there be any reduction?
Modeling Procedure for ERV,HRW,Treated Fresh Air Units
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All we have model the factory project with 50% A/c and 50% Ventilation and the fresh air is supplied by ERV, HRW, Treated fresh air units to A/c areas but the ERV, HRW, Treated fresh air unit
HVAC modelling for Tenant Occupied Spaces
CS-2009 EAp2:Minimum Energy Performanceposted by Saumendra Aggrawal on
I am working on a project, which is going for LEED C&S. The project has tenant occupied space, which has designed HVAC system for it.
Thermal Comfort - Adaptive Method
NC-2009 IEQc7.1:Thermal Comfort—Designposted by SAMY Chamy on
Dear All we are using (http://smap.cbe.berkeley.edu/comforttool) this link for thermal comfort results but we use PMV method for A/c areas and Adaptive method for ventilated areas (due to lack of
Thermal Comfort - Adaptive Method
NC-2009 IEQc7.1:Thermal Comfort—Designposted by SAMY Chamy on
Dear All:- As of now we are using berkeley.edu/comfort tool for thermal comfort compliance for both A/c & Non A/c area But we use PMV method for A/c area and adaptive method for Non A/c area
dedicated wind farm
NC-2009 EAc6:Green powerposted by Erin Holdenried on
I have a project with a dedicated wind farm. The wind farm is offsite, built by a 3rd party with a contract to supply 100% of the project's electricity usage for 10 years.
Documentation
Healthcare-v4 MRp3:PBT source reduction - mercuryposted by David Dixon on
Working on a v2009 BD+C project and using the credit as an ID credit looking for information on accepted documentation. Any insight will be helpful