Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

when we register a pilot credit....

Pilot-Credits EApc65:Monitoring based commissioning
posted by  Gail Napell  on 

we registered the pilot credit; is it supposed to show up in the project in LEEDonline? how do we upload the documentation???? thanks for guidance -

0

Option 3 Guidance Now Available!

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Paula Melton  on 

The actual points won't be achievable for a few months, but USGBC has released implmentation guidance. Please see the details here:

0

FSC Mix 97%, Composed of 100% new wood by weight.

CI-2009 MRc7:Certified Wood
posted by  H. Group  on 

I rec'd a letter from manf. of the door company. It stated the door i ordered is FSC Mix 97%. Composed of 100 new wood by weight, FSC COC Code xxxxx.

1
Tue Dec 29, 2015, 8:05 pm

VT Industries - Wood Veneer Structural Composite Lumber Core Doo

CI-2009 MRc4:Recycled Content
posted by  H. Group  on 

VT sent me a letter stating MR4 & MR5 no assistance available. I called but didn't do me any good. Does anyone know if this door contain any recycled content? thank you

1
Sun Nov 15, 2015, 2:12 pm

Option 1 and Option 2

NC-v4 EQp2:Environmental tobacco smoke control
posted by  Jen Roberts  on 

I just need clarification on something. In the reference guide, it states "Residential only" for Option 1.

1
Sun Nov 15, 2015, 5:43 pm

Which MRT to use

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Jordan Kirrane  on 

Hi, I have the annual hourly mean radiant temperature results (from the energy model simulation). I'm wondering what MRT you have used in the past if you have all of these figures?

1
Tue Dec 1, 2015, 4:24 pm

OA Air Flow Monitoring in Laundry

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Joe Kaminski  on 

The project I am working on has large laundry area with outside air provided for makeup air for the dryer exhaust.

1
Wed Dec 9, 2015, 3:20 pm

Credit Specific requirements and Additional Questions mis-match

Credit Forums
posted by  Carolyn Day  on 

There seems to be a mis-match between the credit description and the requirements.

1
Wed Mar 16, 2016, 2:04 pm

Probability distribution of annual PV production.

NC-2009 EAc2:On-Site Renewable Energy
posted by  Indochine Engineering VN  on 

Hi, a solar PV consultant gave me an output of their simulation, in which show probability distribution diagram of Solar PV production.

1
Tue Nov 17, 2015, 2:23 pm

Urban setting/city block difficulties

Pilot-Credits PC14:Walkable Streets
posted by  Nicholas Bristow  on 

When completing this pilot credit, it seems that it should give more allowances for buildings that have streets on all four sides (take up an entire city block).

1
Wed Apr 6, 2016, 4:26 pm