LEED Boundary adjacent to the Ocean

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Thomas Ehrnschwender  on 

Project is adjacent to the Atlantic Ocean. The sand dune is protected with many native plant species and a nesting habitat for 5 different endangered turtle species.

1
Fri Nov 27, 2015, 3:44 am

Future Pedestrian Access

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Rachel Weber  on 

We have a project that will meet SS2 once pedestrian access is available. Do you know if it is adequate to show the sidewalk is in the county's budget?

1
Fri Nov 27, 2015, 3:32 am

IEQ-4 Credit documentation

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Frank Burkhart  on 

I am hoping someone can direct me as to the best way to fill out the IEQ-4 forms given the situation. We are in a pre-bid situation filling out the LEED forms, and because it is public bid work we

1
Wed Nov 11, 2015, 9:07 pm

Very old CI 2009 registered project - can we still certify?

CI-2009 PIf1:Minimum Program Requirements
posted by  Eric Thompson  on 

Hi I'm helping a colleague who has a project that was registered in 2011 for LEED CI 2009 and construction completed / substantial completion in 2011.

1
Thu Nov 12, 2015, 8:00 pm

VRP Compliance Calculator

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, Regarding VRP Compliance Calculator (IEQp1), there is a question on how to enter an AHU having the following characteristics: The AHU is a constant volume device; supplying to several

1
Fri Nov 13, 2015, 8:02 pm

Tools and flexibility

Pilot-Credits MRpc63:Whole building life cycle assessment
posted by  Devani PERERA  on 

There are secral tools that can be used for LCA but it appears that some tools are more detailed than others. In europe the calculation methods seems to go into great detail.

0

LEED V3 2009 SSc3- Asbestos contamination

General forums
posted by  Patrice McVeigh  on 

I have a project where two forms of asbestos contamination has been identified. One on pipework and the other in the existing floor slab adhesive - SSc3 Brownfield development.

0

Modified rational method - rainfall intensity

NC-v4 SSc4:Rainwater management
posted by  Hana Raitrova  on 

Dear All, I´m still wondering how to get a value of rainfall intesity in inches/hour or mm/hour for the 95th percentile (option 2 - modified rathional method) based on time concentration.

1
Fri Nov 13, 2015, 4:47 pm

Balancing Devices to meet ASHRAE 90.1 Mandatory Requirements

NC-2009 EAp2:Minimum Energy Performance
posted by  Jorge Torres-Coto  on 

We have a project that is an industrial facility, it shares the CHW distribution piping between the comfort system and the process system. We are informing the CxTeam that it is required to have b

1
Mon Nov 30, 2015, 3:56 pm

SSpc14 Walkable Project Sites - navigating process

Pilot-Credits PC14:Walkable Streets
posted by  Margaret Montgomery  on 

Wow. The credit makes some sense, but the process is definitely a challenge. I just spent 20 minutes trying to find the survey to complete it.

1
Tue Mar 8, 2016, 10:08 pm