NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Emmanuel Pauwels on
In order to comply with the alternative option we would choose to donate land to a land trust within the same EPA Level III Ecoregion identified for the project site.
Green roof eligibility
NC-v4 WEc1:Outdoor water use reductionposted by Davis Kantor on
Is a non-irrigated vegetated roof included in this credit calculation? It seems obvious that an accessible green roof would be. How about a non-accessible green roof?
Existing Dining Facility Building v3 rating system
posted by Emily Wang on
I'm working on an existing Dining facility which has a significant amount of interior renovations and a small amount of NC, and exterior.
energy-saving target during construction
CS-2009 IDc1:Innovation in Designposted by Dee Yun on
Hi, I have a project that has energy-saving target during the construction phase.
CI MRc2 Concrete & Brick
CI-2009 MRc2:Construction Waste Managementposted by Joseph Sneed on
I have a project that has a lot of brick & concrete demolition. This will be used as "clean fill" at a Metrofill site located somewhere else and not taken to a "landfill".
Is the requirement 10fc or 25fc for simulation?
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by James Geers on
The printed material states that the simulation threshold is 25fc but LEEDuser states there is a 10fc threshhold. Has this been revised?
set top boxes and other lab test equipment
CI-2009 EAp2:Minimum Energy Performanceposted by Gail Napell on
We have a client who runs tests on Set Top Boxes in a test lab for their customers to determine problems and fix them.
DEC - EBOM
EBOM-2009 WEc4:Cooling Tower Water Managementposted by babu rajendran on
My project getting chilled water from District energy center which has cooling towers.
Peak and Daily Average Transient
posted by Jin Park on
I recived review report last weekend. The comment is follwing. "Peak transient occupants have not included in the form." I would like to know the difference between Peak and Average Transient Visit
ventilation flow rate
CI-2009 IEQc2:Increased Ventlilationposted by ilkyaz ceren güçlü on
Hi, We work on a project in Turkey and I have a trouble about calculations on technical areas. Is it subject %30 increase the flow rate in technical areas?